IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,110

matching recommendations
Reset
SIC 3714 Motor Vehicle Parts And Accessories
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0453 # 01 Y:1999 01 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $60,085 $139,425 Not Implemented
MA0453 # 02 Y:1999 02 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $38,897 $96,900 Not Implemented
MA0453 # 03 Y:1999 03 1999 RECOVER WASTE HEAT FROM EQUIPMENT $19,476 $45,000 Not Implemented
MA0453 # 04 Y:1999 04 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,766 $19,425 Not Implemented
MA0453 # 05 Y:1999 05 1999 USE LESS WASTEFUL PACKAGING $8,714 $15,000 Not Implemented
MA0453 # 06 Y:1999 06 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,433 $10,115 Not Implemented
MO0262 # 01 Y:1999 01 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,918 $100 Implemented
MO0262 # 02 Y:1999 02 1999 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $417 $500 Implemented
MO0262 # 03 Y:1999 03 1999 CONTRACT A WOOD PALLET RECYCLING COMPANY $5,100 $0 Implemented
MO0262 # 04 Y:1999 04 1999 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $57,053 $0 Implemented
MO0262 # 05 Y:1999 05 1999 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $23,117 $30,000 Not Implemented
MS0141 # 01 Y:1999 01 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $23,874 $806 Implemented
MS0141 # 02 Y:1999 02 1999 TURN OFF EQUIPMENT WHEN NOT IN USE $4,514 $99 Implemented
MS0141 # 03 Y:1999 03 1999 USE PHOTOCELL CONTROLS $545 $207 Not Implemented
MS0141 # 04 Y:1999 04 1999 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $32,935 $20,968 Not Implemented
MS0141 # 05 Y:1999 05 1999 USE RE-USABLE FILTERS $1,978 $776 Not Implemented
MS0141 # 06 Y:1999 06 1999 BURN WASTE OIL FOR HEAT $1,780 $3,916 Not Implemented
MS0141 # 07 Y:1999 07 1999 COMBINE UTILITY METERS $148 $183 Not Implemented
TN0667 # 01 Y:1999 01 1999 RECOVER AND REUSE WASTE MATERIAL $222,220 $77,760 Not Implemented
TN0667 # 02 Y:1999 02 1999 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $52,782 $80,100 Implemented
TN0667 # 03 Y:1999 03 1999 METER WASTE WATER $26,280 $2,980 Implemented
TN0667 # 04 Y:1999 04 1999 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME $22,500 $25,000 Not Implemented
TN0667 # 05 Y:1999 05 1999 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $20,700 $21,780 Not Implemented
TN0667 # 06 Y:1999 06 1999 OPTIMIZE PLANT POWER FACTOR $15,168 $29,100 Not Implemented
UL0218 # 01 Y:1999 01 1999 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $8,888 $54,400 n/a