IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,110

matching recommendations
Reset
SIC 3714 Motor Vehicle Parts And Accessories
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0190 # 06 Y:2024 06 2024 INSTALL OCCUPANCY SENSORS $1,572 $559 Not Implemented
IP0190 # 07 Y:2024 07 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,128 $4,817 Not Implemented
IP0190 # 08 Y:2024 08 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,672 $10,914 Not Implemented
IP0190 # 09 Y:2024 09 2024 USE RADIANT HEATER FOR SPOT HEATING $1,750 $1,800 Not Implemented
LE0560 # 01 Y:2024 01 2024 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,343 $0 Implemented
LE0560 # 02 Y:2024 02 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,722 $100 Implemented
LE0560 # 03 Y:2024 03 2024 INSTALL OCCUPANCY SENSORS $9,378 $9,800 Not Implemented
LE0560 # 04 Y:2024 04 2024 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $2,378 $2,500 Implemented
LE0560 # 05 Y:2024 05 2024 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $16,740 $51,000 Not Implemented
LE0560 # 06 Y:2024 06 2024 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,350 $11,000 Implemented
LE0560 # 07 Y:2024 07 2024 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $9,755 $45,000 Not Implemented
TT0314 # 01 Y:2024 01 2024 UPGRADE OBSOLETE EQUIPMENT $51,299 $312,500 Implemented
TT0314 # 02 Y:2024 02 2024 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $36,167 $16,000 Implemented
TT0314 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,281 $1,500 Implemented
TT0314 # 04 Y:2024 04 2024 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $8,319 $9,842 Implemented
TT0314 # 05 Y:2024 05 2024 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,118 $21,260 Not Implemented
TT0314 # 06 Y:2024 06 2024 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,036 $8,059 Implemented
TT0314 # 07 Y:2024 07 2024 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,112 $0 Implemented
TT0314 # 08 Y:2024 08 2024 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $1,111 $4,500 Implemented
MU0040 # 01 Y:2023 01 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $106,121 $1,404,000 Not Implemented
MU0040 # 02 Y:2023 02 2023 INSTALL OCCUPANCY SENSORS $213 $315 Implemented
MU0040 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,004 $41 Implemented
MU0040 # 04 Y:2023 04 2023 MINIMIZE WATER USAGE $68,486 $150,124 Not Implemented
MU0040 # 05 Y:2023 05 2023 PAY BILLS ON TIME TO AVOID LATE FEES $2,306 $0 Not Implemented
UL2309 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,305 $2,688 Implemented