Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
374
matching recommendationsSIC | 3714 | Motor Vehicle Parts And Accessories |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MU0061 # 09 Y:2024 | 09 | 2024 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $370 | $1,608 | n/a |
MU0061 # 02 Y:2024 | 02 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,426 | $12,734 | n/a |
MU0061 # 07 Y:2024 | 07 | 2024 | USE RADIANT HEATER FOR SPOT HEATING | $2,592 | $10,260 | n/a |
MU0061 # 06 Y:2024 | 06 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $89 | $114 | n/a |
MU0061 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,134 | $0 | n/a |
MU0061 # 05 Y:2024 | 05 | 2024 | INSTALL OCCUPANCY SENSORS | $246 | $339 | n/a |
MU0061 # 04 Y:2024 | 04 | 2024 | INSTALL SET-BACK TIMERS | $24,478 | $160,704 | n/a |
MU0061 # 08 Y:2024 | 08 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $393 | $580 | n/a |
MU0061 # 01 Y:2024 | 01 | 2024 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $3,468 | $4,140 | n/a |
MU0045 # 08 Y:2024 | 08 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,871 | $0 | n/a |
MU0045 # 09 Y:2024 | 09 | 2024 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $38,860 | $12,105 | n/a |
MU0045 # 10 Y:2024 | 10 | 2024 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $5,014 | $4,165 | n/a |
MU0045 # 11 Y:2024 | 11 | 2024 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $1,256 | $1,302 | n/a |
MU0045 # 07 Y:2024 | 07 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,694 | $706 | n/a |
MU0045 # 06 Y:2024 | 06 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $5,088 | $0 | n/a |
MU0045 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,606 | $17 | n/a |
MU0045 # 04 Y:2024 | 04 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $7,936 | $18,703 | n/a |
MU0045 # 03 Y:2024 | 03 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $31,005 | $34,270 | n/a |
MU0045 # 02 Y:2024 | 02 | 2024 | OPTIMIZE PLANT POWER FACTOR | $14,981 | $56,840 | n/a |
MU0045 # 01 Y:2024 | 01 | 2024 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,629 | $0 | n/a |
MU0045 # 12 Y:2024 | 12 | 2024 | MINIMIZE WATER USAGE | $25,914 | $8,239 | n/a |
MU0045 # 13 Y:2024 | 13 | 2024 | MINIMIZE WATER USAGE | $60,609 | $146,420 | n/a |
MU0045 # 14 Y:2024 | 14 | 2024 | PAY BILLS ON TIME TO AVOID LATE FEES | $4,768 | $0 | n/a |
MU0040 # 01 Y:2023 | 01 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $106,121 | $1,404,000 | Not Implemented |
MU0040 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,004 | $41 | Implemented |