IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

65

matching recommendations
Reset
SIC 3714 Motor Vehicle Parts And Accessories
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TR0006 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $271 $279 n/a
TR0006 # 07 Y:2017 07 2017 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $11,119 $3,360 n/a
TR0006 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $30,038 $21,816 n/a
TR0006 # 08 Y:2017 08 2017 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $23,655 $0 n/a
TR0006 # 04 Y:2017 04 2017 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $31,644 $0 n/a
TR0006 # 05 Y:2017 05 2017 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $4,005 $208 n/a
TR0006 # 03 Y:2017 03 2017 INSULATE BARE EQUIPMENT $5,324 $88 n/a
TR0006 # 06 Y:2017 06 2017 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $117,470 $11,908 n/a
AM0726 # 04 Y:2017 04 2017 INSULATE BARE EQUIPMENT $13,440 $1,904 Implemented
AM0726 # 03 Y:2017 03 2017 PAY UTILITY BILLS ON TIME $15,714 $0 Not Implemented
AM0726 # 02 Y:2017 02 2017 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $13,960 $1,200 Implemented
AM0726 # 01 Y:2017 01 2017 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $268,194 $100,000 Not Implemented
AM0726 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,305 $6,120 Implemented
AM0726 # 06 Y:2017 06 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,185 $265 Not Implemented
AM0726 # 07 Y:2017 07 2017 INSTALL OCCUPANCY SENSORS $155 $220 Not Implemented
TA0079 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $38,280 $720 Implemented
TA0079 # 02 Y:2004 02 2004 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $15,200 $7,680 Not Implemented
TA0079 # 04 Y:2004 04 2004 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $1,490 $200 Implemented
TA0079 # 07 Y:2004 07 2004 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $280 $0 Implemented
TA0079 # 06 Y:2004 06 2004 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $637 $0 Not Implemented
TA0079 # 03 Y:2004 03 2004 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $5,240 $300 Not Implemented
TA0079 # 05 Y:2004 05 2004 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,450 $720 Implemented
TA0032 # 01 Y:2002 01 2002 CONTRACT A WOOD PALLET RECYCLING COMPANY $39,000 $0 Implemented
TA0032 # 05 Y:2002 05 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $900 $55 Not Implemented
TA0032 # 02 Y:2002 02 2002 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $37,007 $0 Implemented