Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
69
matching recommendationsSIC | 3714 | Motor Vehicle Parts And Accessories |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TR0059 # 04 Y:2024 | 04 | 2024 | METER WASTE WATER | $5,966 | $1,570 | n/a |
TR0059 # 01 Y:2024 | 01 | 2024 | COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER | $36,781 | $32,522 | n/a |
TR0059 # 03 Y:2024 | 03 | 2024 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $18,395 | $4,000 | n/a |
TR0059 # 02 Y:2024 | 02 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $148,771 | $739,065 | n/a |
TR0006 # 06 Y:2017 | 06 | 2017 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $117,470 | $11,908 | n/a |
TR0006 # 07 Y:2017 | 07 | 2017 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $11,119 | $3,360 | n/a |
TR0006 # 04 Y:2017 | 04 | 2017 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $31,644 | $0 | n/a |
TR0006 # 05 Y:2017 | 05 | 2017 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $4,005 | $208 | n/a |
TR0006 # 03 Y:2017 | 03 | 2017 | INSULATE BARE EQUIPMENT | $5,324 | $88 | n/a |
TR0006 # 08 Y:2017 | 08 | 2017 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $23,655 | $0 | n/a |
TR0006 # 01 Y:2017 | 01 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $30,038 | $21,816 | n/a |
TR0006 # 02 Y:2017 | 02 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $271 | $279 | n/a |
AM0726 # 01 Y:2017 | 01 | 2017 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $268,194 | $100,000 | Not Implemented |
AM0726 # 02 Y:2017 | 02 | 2017 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $13,960 | $1,200 | Implemented |
AM0726 # 03 Y:2017 | 03 | 2017 | PAY UTILITY BILLS ON TIME | $15,714 | $0 | Not Implemented |
AM0726 # 04 Y:2017 | 04 | 2017 | INSULATE BARE EQUIPMENT | $13,440 | $1,904 | Implemented |
AM0726 # 05 Y:2017 | 05 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,305 | $6,120 | Implemented |
AM0726 # 06 Y:2017 | 06 | 2017 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,185 | $265 | Not Implemented |
AM0726 # 07 Y:2017 | 07 | 2017 | INSTALL OCCUPANCY SENSORS | $155 | $220 | Not Implemented |
TA0079 # 01 Y:2004 | 01 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $38,280 | $720 | Implemented |
TA0079 # 04 Y:2004 | 04 | 2004 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $1,490 | $200 | Implemented |
TA0079 # 02 Y:2004 | 02 | 2004 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $15,200 | $7,680 | Not Implemented |
TA0079 # 07 Y:2004 | 07 | 2004 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $280 | $0 | Implemented |
TA0079 # 06 Y:2004 | 06 | 2004 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $637 | $0 | Not Implemented |
TA0079 # 03 Y:2004 | 03 | 2004 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $5,240 | $300 | Not Implemented |