IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

235

matching recommendations
Reset
SIC 3714 Motor Vehicle Parts And Accessories
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0187 # 02 Y:2017 02 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $67,895 $250 Not Implemented
UA0187 # 04 Y:2017 04 2017 RECOVER WASTE HEAT FROM EQUIPMENT $33,082 $14,405 Not Implemented
UA0187 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $38,219 $6,260 Implemented
UA0187 # 06 Y:2017 06 2017 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $88,008 $0 Implemented
UA0187 # 01 Y:2017 01 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $14,441 $1,892 Not Implemented
UA0187 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $48,032 $136,663 Implemented
MZ0241 # 01 Y:2017 01 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $326 $0 Implemented
MZ0241 # 09 Y:2017 09 2017 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,210 $12,000 Not Implemented
MZ0241 # 07 Y:2017 07 2017 INSTALL OCCUPANCY SENSORS $658 $700 Implemented
MZ0241 # 03 Y:2017 03 2017 RECOVER WASTE HEAT FROM EQUIPMENT $2,547 $4,050 Implemented
MZ0241 # 10 Y:2017 10 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $93,474 $93,474 Implemented
MZ0241 # 04 Y:2017 04 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,218 $1,820 Implemented
MZ0241 # 08 Y:2017 08 2017 USE SOLAR HEAT TO HEAT WATER $71,196 $875,000 Not Implemented
MZ0241 # 02 Y:2017 02 2017 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $1,238 $3,570 Implemented
MZ0241 # 06 Y:2017 06 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,151 $4,125 Implemented
MZ0241 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $34,321 $100,150 Implemented
IP0092 # 02 Y:2017 02 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $876 $0 Implemented
IP0092 # 03 Y:2017 03 2017 PAY BILLS ON TIME TO AVOID LATE FEES $7,288 $0 Implemented
IP0092 # 01 Y:2017 01 2017 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,211 $0 Implemented
IP0092 # 05 Y:2017 05 2017 INSTALL OCCUPANCY SENSORS $635 $42 Implemented
IP0092 # 06 Y:2017 06 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $8,898 $1,119 Implemented
IP0092 # 07 Y:2017 07 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $112,756 $41,810 Implemented
IP0092 # 04 Y:2017 04 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $546 $31 Implemented
UD0977 # 02 Y:2017 02 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,960 $0 Implemented
UD0977 # 01 Y:2017 01 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $12,684 $6,500 Implemented