Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
218
matching recommendationsSIC | 3715 | Truck Trailers |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0248 # 03 Y:2024 | 03 | 2024 | USE AUTOMATIC FLOW CONTROL | $820 | $4,250 | n/a |
UU0248 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,740 | $1,270 | n/a |
UU0248 # 06 Y:2024 | 06 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $940 | $3,000 | n/a |
UU0248 # 04 Y:2024 | 04 | 2024 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $33,420 | $319,250 | n/a |
UU0248 # 01 Y:2024 | 01 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $980 | $2,600 | n/a |
UU0248 # 05 Y:2024 | 05 | 2024 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $6,380 | $133,800 | n/a |
UU0248 # 07 Y:2024 | 07 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,570 | $9,360 | n/a |
LT8376 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,881 | $31,854 | n/a |
LT8376 # 01 Y:2023 | 01 | 2023 | USE RADIANT HEATER FOR SPOT HEATING | $7,532 | $8,500 | n/a |
LT8376 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,255 | $210 | n/a |
NL0049 # 05 Y:2020 | 05 | 2020 | INSTALL SUB-METERING EQUIPMENT | $2,954 | $354 | Implemented |
NL0049 # 07 Y:2020 | 07 | 2020 | INSULATE BARE EQUIPMENT | $1,475 | $460 | Not Implemented |
NL0049 # 01 Y:2020 | 01 | 2020 | OPTIMIZE PLANT POWER FACTOR | $27,083 | $43,749 | Not Implemented |
NL0049 # 02 Y:2020 | 02 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,291 | $28,235 | Implemented |
NL0049 # 06 Y:2020 | 06 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,894 | $2,550 | Not Implemented |
NL0049 # 03 Y:2020 | 03 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,662 | $4,000 | Not Implemented |
NL0049 # 04 Y:2020 | 04 | 2020 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $3,390 | $90 | Not Implemented |
NL0024 # 03 Y:2018 | 03 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $571 | $0 | Not Implemented |
NL0024 # 01 Y:2018 | 01 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,239 | $33,526 | Implemented |
NL0024 # 04 Y:2018 | 04 | 2018 | METER WASTE WATER | $319 | $0 | Not Implemented |
NL0024 # 02 Y:2018 | 02 | 2018 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $5,242 | $10,000 | Not Implemented |
BS0102 # 03 Y:2017 | 03 | 2017 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $1,991 | $1,301 | Not Implemented |
BS0102 # 06 Y:2017 | 06 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $436 | $672 | Implemented |
BS0102 # 07 Y:2017 | 07 | 2017 | INSTALL OCCUPANCY SENSORS | $91 | $85 | Not Implemented |
BS0102 # 08 Y:2017 | 08 | 2017 | PAY UTILITY BILLS ON TIME | $874 | $144 | Implemented |