Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
26
matching recommendationsSIC | 372 | Aircraft And Parts |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LS1908 # 01 Y:2019 | 01 | 2019 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $3,210 | $0 | Implemented |
LS1908 # 02 Y:2019 | 02 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $64,386 | $25,000 | Implemented |
LS1908 # 04 Y:2019 | 04 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $31,396 | $21,120 | Implemented |
LS1908 # 05 Y:2019 | 05 | 2019 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $46,800 | $30,000 | Implemented |
GT0928 # 02 Y:2019 | 02 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,605 | $1,741 | Implemented |
GT0928 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,360 | $33,097 | Implemented |
GT0928 # 01 Y:2019 | 01 | 2019 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $17,607 | $950 | Implemented |
AS0474 # 04 Y:2019 | 04 | 2019 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,818 | $895 | Implemented |
AS0474 # 08 Y:2019 | 08 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $77 | $0 | Implemented |
AS0474 # 05 Y:2019 | 05 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,935 | $516 | Implemented |
AS0474 # 03 Y:2019 | 03 | 2019 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $7,733 | $750 | Implemented |
AS0474 # 02 Y:2019 | 02 | 2019 | REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT | $9,875 | $2,238 | Implemented |
AS0474 # 01 Y:2019 | 01 | 2019 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $20,118 | $5,404 | Implemented |
SD0580 # 04 Y:2019 | 04 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $426 | $450 | Implemented |
SD0580 # 01 Y:2019 | 01 | 2019 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $49,167 | $126,000 | Implemented |
SD0580 # 02 Y:2019 | 02 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $31,083 | $32,660 | Implemented |
SD0580 # 03 Y:2019 | 03 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,534 | $0 | Implemented |
UU0142 # 07 Y:2019 | 07 | 2019 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $288 | $100 | Implemented |
UU0142 # 05 Y:2019 | 05 | 2019 | INSTALL OCCUPANCY SENSORS | $1,532 | $0 | Implemented |
UU0142 # 04 Y:2019 | 04 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,661 | $0 | Implemented |
UU0142 # 02 Y:2019 | 02 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,981 | $14,585 | Implemented |
MZ0264 # 08 Y:2019 | 08 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $420 | $274 | Implemented |
MZ0264 # 07 Y:2019 | 07 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $975 | $836 | Implemented |
MZ0264 # 04 Y:2019 | 04 | 2019 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,987 | $1,460 | Implemented |
MZ0264 # 03 Y:2019 | 03 | 2019 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $3,139 | $1,050 | Implemented |