IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,491

matching recommendations
Reset
SIC 372 Aircraft And Parts
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0294 # 03 Y:2010 03 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,995 $1,245 Not Implemented
SU0294 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,763 $1,440 Implemented
SU0294 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $267 $492 Implemented
SU0294 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $142 $817 Implemented
SU0294 # 07 Y:2010 07 2010 OPTIMIZE PLANT POWER FACTOR $1,808 $9,734 Not Implemented
SU0294 # 08 Y:2010 08 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,680 $17,732 Not Implemented
SU0294 # 09 Y:2010 09 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $108 $516 Not Implemented
SU0294 # 10 Y:2010 10 2010 UPGRADE OBSOLETE EQUIPMENT $276 $1,831 Implemented
MI0187 # 01 Y:2010 01 2010 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $24,507 $1,800 Implemented
MI0187 # 02 Y:2010 02 2010 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $17,920 $100 Not Implemented
MI0187 # 03 Y:2010 03 2010 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $17,911 $0 Not Implemented
MI0187 # 04 Y:2010 04 2010 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $11,158 $640 Implemented
MI0187 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,880 $4,960 Implemented
MI0187 # 06 Y:2010 06 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $6,598 $640 Implemented
MI0187 # 07 Y:2010 07 2010 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $5,498 $0 Not Implemented
MI0187 # 08 Y:2010 08 2010 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,438 $180 Implemented
MI0187 # 09 Y:2010 09 2010 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,165 $360 Implemented
MA0656 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $33,238 $900 Implemented
MA0656 # 02 Y:2010 02 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $32,273 $19,075 Not Implemented
MA0656 # 03 Y:2010 03 2010 INSTALL / REPAIR INSULATION ON STEAM LINES $2,578 $2,400 Not Implemented
MA0656 # 04 Y:2010 04 2010 RECOVER WASTE HEAT FROM EQUIPMENT $16,891 $15,755 Not Implemented
MA0656 # 05 Y:2010 05 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,718 $3,915 Implemented
MA0656 # 06 Y:2010 06 2010 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $36,936 $68,200 Implemented
MA0656 # 07 Y:2010 07 2010 BURN A LESS EXPENSIVE GRADE OF FUEL $54,013 $100,000 Implemented
MA0656 # 08 Y:2010 08 2010 INSTALL OCCUPANCY SENSORS $1,714 $3,865 Implemented