IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,491

matching recommendations
Reset
SIC 372 Aircraft And Parts
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0606 # 04 Y:2007 04 2007 USE EVAPORATION TO CONCENTRATE MATERIAL $1,060 $3,000 Not Implemented
CO0606 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,630 $69,110 Implemented
CO0606 # 06 Y:2007 06 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,790 $10,000 Implemented
CO0606 # 07 Y:2007 07 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,080 $13,670 Implemented
CO0606 # 08 Y:2007 08 2007 INSTALL OCCUPANCY SENSORS $1,890 $9,180 Implemented
UW0003 # 01 Y:2007 01 2007 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $7,385 $50,000 Not Implemented
UW0003 # 02 Y:2007 02 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $929 $2,100 Implemented
UW0003 # 03 Y:2007 03 2007 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $5,723 $20,750 Not Implemented
UW0003 # 04 Y:2007 04 2007 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $1,551 $7,020 Implemented
UW0003 # 05 Y:2007 05 2007 INSTALL OCCUPANCY SENSORS $905 $1,200 Implemented
MI0154 # 01 Y:2007 01 2007 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $99,787 $131,000 Not Implemented
MI0154 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $41,215 $73,710 Implemented
MI0154 # 03 Y:2007 03 2007 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $30,511 $120 Implemented
MI0154 # 04 Y:2007 04 2007 DISCONNECT BALLASTS $27,192 $1,450 Not Implemented
MI0154 # 05 Y:2007 05 2007 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $10,388 $1,250 Not Implemented
MI0154 # 06 Y:2007 06 2007 PAY BILLS ON TIME TO AVOID LATE FEES $3,146 $300 Implemented
MI0154 # 07 Y:2007 07 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,092 $1,074 Implemented
MI0154 # 08 Y:2007 08 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,043 $30 Implemented
UF0402 # 01 Y:2007 01 2007 PREHEAT COMBUSTION AIR WITH WASTE HEAT $29,529 $1,827 Not Implemented
UF0402 # 02 Y:2007 02 2007 USE OPTIMUM THICKNESS INSULATION $640 $2,320 Not Implemented
UF0402 # 03 Y:2007 03 2007 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $335 $177 Implemented
UF0402 # 04 Y:2007 04 2007 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $2,214 $0 Implemented
UF0402 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $64,361 $80,399 Not Implemented
UF0402 # 06 Y:2007 06 2007 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $13,315 $57,868 Not Implemented
UF0402 # 07 Y:2007 07 2007 INSTALL OCCUPANCY SENSORS $3,641 $194 Implemented