IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,431

matching recommendations
Reset
SIC 372 Aircraft And Parts
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0050 # 09 Y:1985 09 1985 INSTALL TURBULATORS $793 $1,000 Not Implemented
CO0050 # 10 Y:1985 10 1985 IMPROVE LUBRICATION PRACTICES $157 $0 Not Implemented
CO0050 # 11 Y:1985 11 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $825 $3,564 Not Implemented
GT0234 # 01 Y:1984 01 1984 USE DEMAND CONTROLLER OR LOAD SHEDDER $26,550 $30,000 Implemented
GT0234 # 02 Y:1984 02 1984 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $243 $386 Implemented
GT0234 # 03 Y:1984 03 1984 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $6,500 $20,000 Not Implemented
UD0139 # 01 Y:1984 01 1984 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $3,912 $510 Implemented
UD0139 # 02 Y:1984 02 1984 INSTALL TIMERS AND/OR THERMOSTATS $3,450 $62 Implemented
UD0139 # 03 Y:1984 03 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,083 $530 Implemented
UD0139 # 04 Y:1984 04 1984 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,318 $0 Implemented
UD0139 # 05 Y:1984 05 1984 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $7,736 $15,100 Implemented
KU0133 # 01 Y:1984 01 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,390 $10,201 Implemented
KU0133 # 02 Y:1984 02 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $870 $1,810 Implemented
KU0133 # 03 Y:1984 03 1984 USE DEMAND CONTROLLER OR LOAD SHEDDER $10,922 $7,500 Implemented
KU0133 # 04 Y:1984 04 1984 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $3,981 $10,000 Not Implemented
KU0133 # 05 Y:1984 05 1984 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $5,567 $1,589 Implemented
KU0133 # 06 Y:1984 06 1984 USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD $4,813 $2,800 Implemented
KU0133 # 07 Y:1984 07 1984 IMPROVE LUBRICATION PRACTICES $3,302 $1,950 Not Implemented
KU0133 # 08 Y:1984 08 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,626 $0 Implemented
KU0133 # 09 Y:1984 09 1984 INSTALL AUTOMATIC STACK DAMPER $1,231 $3,300 Implemented
KU0133 # 10 Y:1984 10 1984 RECOVER WASTE HEAT FROM EQUIPMENT $3,584 $2,900 Implemented
KU0133 # 11 Y:1984 11 1984 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,316 $450 Implemented
KU0133 # 12 Y:1984 12 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,130 $113 Implemented
KU0133 # 13 Y:1984 13 1984 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,562 $0 Implemented
KU0133 # 14 Y:1984 14 1984 INSULATE BARE EQUIPMENT $669 $400 Implemented