Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
26
matching recommendationsSIC | 372 | Aircraft And Parts |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0234 # 02 Y:1984 | 02 | 1984 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $243 | $386 | Implemented |
UD0139 # 05 Y:1984 | 05 | 1984 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $7,736 | $15,100 | Implemented |
UD0139 # 04 Y:1984 | 04 | 1984 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,318 | $0 | Implemented |
UD0139 # 03 Y:1984 | 03 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,083 | $530 | Implemented |
UD0139 # 02 Y:1984 | 02 | 1984 | INSTALL TIMERS AND/OR THERMOSTATS | $3,450 | $62 | Implemented |
UD0139 # 01 Y:1984 | 01 | 1984 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $3,912 | $510 | Implemented |
GT0234 # 01 Y:1984 | 01 | 1984 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $26,550 | $30,000 | Implemented |
GT0234 # 03 Y:1984 | 03 | 1984 | REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF | $6,500 | $20,000 | Not Implemented |
KU0133 # 14 Y:1984 | 14 | 1984 | INSULATE BARE EQUIPMENT | $669 | $400 | Implemented |
KU0133 # 01 Y:1984 | 01 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,390 | $10,201 | Implemented |
KU0133 # 02 Y:1984 | 02 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $870 | $1,810 | Implemented |
KU0133 # 03 Y:1984 | 03 | 1984 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $10,922 | $7,500 | Implemented |
KU0133 # 18 Y:1984 | 18 | 1984 | ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE | $245 | $250 | Implemented |
KU0133 # 17 Y:1984 | 17 | 1984 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $365 | $144 | Implemented |
KU0133 # 16 Y:1984 | 16 | 1984 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $378 | $0 | Implemented |
KU0133 # 15 Y:1984 | 15 | 1984 | INSULATE BARE EQUIPMENT | $626 | $450 | Implemented |
KU0133 # 04 Y:1984 | 04 | 1984 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $3,981 | $10,000 | Not Implemented |
KU0133 # 13 Y:1984 | 13 | 1984 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,562 | $0 | Implemented |
KU0133 # 12 Y:1984 | 12 | 1984 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,130 | $113 | Implemented |
KU0133 # 11 Y:1984 | 11 | 1984 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,316 | $450 | Implemented |
KU0133 # 10 Y:1984 | 10 | 1984 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,584 | $2,900 | Implemented |
KU0133 # 09 Y:1984 | 09 | 1984 | INSTALL AUTOMATIC STACK DAMPER | $1,231 | $3,300 | Implemented |
KU0133 # 08 Y:1984 | 08 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,626 | $0 | Implemented |
KU0133 # 07 Y:1984 | 07 | 1984 | IMPROVE LUBRICATION PRACTICES | $3,302 | $1,950 | Not Implemented |
KU0133 # 06 Y:1984 | 06 | 1984 | USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD | $4,813 | $2,800 | Implemented |