Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
46
matching recommendationsSIC | 372 | Aircraft And Parts |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0302 # 06 Y:2002 | 06 | 2002 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $1,236 | $665 | Implemented |
IA0302 # 05 Y:2002 | 05 | 2002 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $13,521 | $5,000 | Not Implemented |
IA0302 # 04 Y:2002 | 04 | 2002 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $409 | $36 | Not Implemented |
IA0302 # 03 Y:2002 | 03 | 2002 | INSTALL OCCUPANCY SENSORS | $307 | $333 | Not Implemented |
IA0302 # 02 Y:2002 | 02 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,323 | $120 | Not Implemented |
IA0302 # 01 Y:2002 | 01 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,423 | $6,500 | Not Implemented |
MA0519 # 03 Y:2002 | 03 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,294 | $6,675 | Not Implemented |
MA0519 # 02 Y:2002 | 02 | 2002 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $17,181 | $2,500 | Not Implemented |
MA0519 # 01 Y:2002 | 01 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $28,771 | $13,775 | Not Implemented |
MA0519 # 04 Y:2002 | 04 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,344 | $450 | Implemented |
MA0519 # 05 Y:2002 | 05 | 2002 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,240 | $500 | Implemented |
MS0212 # 04 Y:2002 | 04 | 2002 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $29,000 | $79,245 | Implemented |
MS0212 # 01 Y:2002 | 01 | 2002 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $1,698 | $1,707 | Not Implemented |
MS0212 # 02 Y:2002 | 02 | 2002 | USE SYNTHETIC LUBRICANT | $1,158 | $760 | Not Implemented |
MS0212 # 03 Y:2002 | 03 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $982 | $477 | Implemented |
OK0640 # 04 Y:2002 | 04 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $583 | $225 | n/a |
OK0640 # 02 Y:2002 | 02 | 2002 | INSTALL SET-BACK TIMERS | $8,851 | $996 | n/a |
OK0640 # 03 Y:2002 | 03 | 2002 | INSTALL OCCUPANCY SENSORS | $1,022 | $214 | n/a |
OK0640 # 01 Y:2002 | 01 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,949 | $690 | n/a |
UD0645 # 04 Y:2002 | 04 | 2002 | INSTALL TIMERS AND/OR THERMOSTATS | $10,178 | $2,325 | n/a |
UD0645 # 01 Y:2002 | 01 | 2002 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $64,277 | $3,300 | n/a |
UD0645 # 06 Y:2002 | 06 | 2002 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,431 | $7,030 | n/a |
UD0645 # 10 Y:2002 | 10 | 2002 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $207 | $250 | n/a |
UD0645 # 02 Y:2002 | 02 | 2002 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $28,640 | $1,000 | n/a |
UD0645 # 03 Y:2002 | 03 | 2002 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $13,252 | $0 | n/a |