IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

61

matching recommendations
Reset
SIC 372 Aircraft And Parts
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0685 # 05 Y:2011 05 2011 INSTALL OCCUPANCY SENSORS $898 $1,280 Not Implemented
MA0685 # 04 Y:2011 04 2011 REDUCE VENTILATION AIR $2,713 $6,300 Implemented
MA0685 # 03 Y:2011 03 2011 OPTIMIZE PLANT POWER FACTOR $3,520 $9,425 Implemented
MA0685 # 02 Y:2011 02 2011 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,714 $0 Not Implemented
MA0685 # 01 Y:2011 01 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,634 $7,050 Not Implemented
MS0384 # 03 Y:2011 03 2011 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $7,101 $13,781 Not Implemented
MS0384 # 02 Y:2011 02 2011 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $3,680 $611 Not Implemented
MS0384 # 01 Y:2011 01 2011 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $6,041 $1,900 Not Implemented
DL0079 # 09 Y:2011 09 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $306 $360 Not Implemented
DL0079 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,207 $27,090 Not Implemented
DL0079 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,495 $36,850 Implemented
DL0079 # 03 Y:2011 03 2011 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $12,737 $100 Implemented
DL0079 # 04 Y:2011 04 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $5,364 $1,015 Implemented
DL0079 # 08 Y:2011 08 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $464 $105 Implemented
DL0079 # 05 Y:2011 05 2011 RECOVER WASTE HEAT FROM EQUIPMENT $7,317 $350 Implemented
DL0079 # 07 Y:2011 07 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,834 $15,000 Not Implemented
DL0079 # 06 Y:2011 06 2011 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $7,695 $26,400 Not Implemented
NC0436 # 06 Y:2011 06 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $12,954 $6,435 Implemented
NC0436 # 07 Y:2011 07 2011 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $5,967 $27,000 Not Implemented
NC0436 # 08 Y:2011 08 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,009 $1,000 Implemented
NC0436 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,241 $21,888 Not Implemented
NC0436 # 05 Y:2011 05 2011 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $8,955 $11,000 Not Implemented
NC0436 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,560 $100 Implemented
NC0436 # 03 Y:2011 03 2011 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $18,076 $4,000 Implemented
NC0436 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $107,275 $300,044 Not Implemented