IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

210

matching recommendations
Reset
SIC 3721 Aircraft
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0022 # 06 Y:2013 06 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $871 $15 Implemented
BS0022 # 05 Y:2013 05 2013 REPAIR AND ELIMINATE STEAM LEAKS $1,748 $697 Implemented
BS0022 # 04 Y:2013 04 2013 COVER OPEN TANKS $418 $310 Not Implemented
BS0022 # 03 Y:2013 03 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,022 $26,934 Not Implemented
BS0022 # 02 Y:2013 02 2013 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,989 $218 Implemented
BS0022 # 01 Y:2013 01 2013 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $3,444 $500 Implemented
GT0881 # 04 Y:2011 04 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,921 $21,722 Not Implemented
GT0881 # 08 Y:2011 08 2011 COMBINE UTILITY METERS $14,342 $10,000 Implemented
GT0881 # 07 Y:2011 07 2011 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $38,551 $150,000 Not Implemented
GT0881 # 06 Y:2011 06 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,188 $38,276 Not Implemented
GT0881 # 05 Y:2011 05 2011 DISCONNECT BALLASTS $588 $0 Not Implemented
GT0881 # 03 Y:2011 03 2011 INSTALL COMMON HEADER ON COMPRESSORS $2,800 $3,200 Not Implemented
GT0881 # 02 Y:2011 02 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,731 $0 Not Implemented
GT0881 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,620 $15,500 Implemented
OK0801 # 11 Y:2010 11 2010 OPTIMIZE PLANT POWER FACTOR $669 $9,307 Not Implemented
OK0801 # 10 Y:2010 10 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,069 $14,336 Not Implemented
OK0801 # 09 Y:2010 09 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $299 $201 Not Implemented
OK0801 # 08 Y:2010 08 2010 INSTALL OCCUPANCY SENSORS $547 $1,658 Not Implemented
OK0801 # 07 Y:2010 07 2010 RECOVER WASTE HEAT FROM EQUIPMENT $3,015 $2,017 Not Implemented
OK0801 # 06 Y:2010 06 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $523 $516 Not Implemented
OK0801 # 04 Y:2010 04 2010 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $995 $2,625 Implemented
OK0801 # 12 Y:2010 12 2010 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $4,196 $21,075 Implemented
OK0801 # 01 Y:2010 01 2010 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $6,511 $78,169 Implemented
OK0801 # 03 Y:2010 03 2010 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $9,699 $3,000 Implemented
OK0801 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,205 $660 Not Implemented