Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
230
matching recommendationsSIC | 3721 | Aircraft |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0354 # 07 Y:2004 | 07 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,543 | $0 | Implemented |
UF0354 # 08 Y:2004 | 08 | 2004 | ADD AREA LIGHTING SWITCHES | $2,354 | $11,495 | Not Implemented |
UF0354 # 09 Y:2004 | 09 | 2004 | RECYCLE FLUORESCENT LAMPS | $2,883 | $3,496 | Not Implemented |
MS0212 # 01 Y:2002 | 01 | 2002 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $1,698 | $1,707 | Not Implemented |
MS0212 # 02 Y:2002 | 02 | 2002 | USE SYNTHETIC LUBRICANT | $1,158 | $760 | Not Implemented |
MS0212 # 03 Y:2002 | 03 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $982 | $477 | Implemented |
MS0212 # 04 Y:2002 | 04 | 2002 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $29,000 | $79,245 | Implemented |
UF0273 # 01 Y:2001 | 01 | 2001 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $48,885 | $50 | Not Implemented |
UF0273 # 02 Y:2001 | 02 | 2001 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $916 | $525 | Implemented |
UF0273 # 03 Y:2001 | 03 | 2001 | INSTALL OCCUPANCY SENSORS | $381 | $414 | Implemented |
UF0273 # 04 Y:2001 | 04 | 2001 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,421 | $5,130 | Not Implemented |
UF0273 # 05 Y:2001 | 05 | 2001 | TURN OFF EQUIPMENT WHEN NOT IN USE | $624 | $0 | Implemented |
UF0273 # 06 Y:2001 | 06 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $29,486 | $9,838 | Not Implemented |
UF0273 # 07 Y:2001 | 07 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,118 | $436 | Not Implemented |
UF0273 # 08 Y:2001 | 08 | 2001 | RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER | $42,120 | $35,000 | Not Implemented |
UF0273 # 09 Y:2001 | 09 | 2001 | DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING | $8,415 | $2,324 | Not Implemented |
UF0273 # 10 Y:2001 | 10 | 2001 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $59,693 | $4,000 | Implemented |
AS0256 # 01 Y:1999 | 01 | 1999 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $6,547 | $4,500 | Not Implemented |
AS0256 # 02 Y:1999 | 02 | 1999 | INSTALL OCCUPANCY SENSORS | $9,763 | $2,550 | Not Implemented |
AS0256 # 03 Y:1999 | 03 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,273 | $1,496 | Not Implemented |
AS0256 # 04 Y:1999 | 04 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,376 | $14,720 | Not Implemented |
AS0256 # 05 Y:1999 | 05 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $29,301 | $22,500 | Not Implemented |
AS0256 # 06 Y:1999 | 06 | 1999 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $4,880 | $4,220 | Not Implemented |
AS0256 # 07 Y:1999 | 07 | 1999 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $22,194 | $2,804 | Not Implemented |
AS0256 # 08 Y:1999 | 08 | 1999 | DE-ENERGIZE EXCESS TRANSFORMER CAPACITY | $23,808 | $59,466 | Not Implemented |