Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
27
matching recommendationsSIC | 3724 | Aircraft Engines And Engine Parts |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0734 # 10 Y:2006 | 10 | 2006 | USE PHOTOCELL CONTROLS | $477 | $275 | Implemented |
UD0734 # 11 Y:2006 | 11 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $465 | $53 | Implemented |
UD0734 # 09 Y:2006 | 09 | 2006 | REDUCE VENTILATION AIR | $750 | $0 | Implemented |
UD0734 # 07 Y:2006 | 07 | 2006 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,798 | $8,041 | Implemented |
UD0734 # 05 Y:2006 | 05 | 2006 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $2,510 | $0 | Implemented |
UD0734 # 04 Y:2006 | 04 | 2006 | MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS | $2,800 | $0 | Implemented |
UD0734 # 03 Y:2006 | 03 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,023 | $1,900 | Implemented |
UD0734 # 01 Y:2006 | 01 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,890 | $19,500 | Implemented |
UD0715 # 01 Y:2005 | 01 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,797 | $53,464 | Implemented |
UD0715 # 09 Y:2005 | 09 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $531 | $0 | Implemented |
UD0715 # 07 Y:2005 | 07 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $781 | $340 | Implemented |
UD0715 # 05 Y:2005 | 05 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,021 | $0 | Implemented |
UD0715 # 04 Y:2005 | 04 | 2005 | REPAIR AND ELIMINATE STEAM LEAKS | $2,597 | $500 | Implemented |
UD0715 # 03 Y:2005 | 03 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,402 | $100 | Implemented |
UD0414 # 05 Y:1993 | 05 | 1993 | INSTALL SET-BACK TIMERS | $1,689 | $1,500 | Implemented |
UD0414 # 04 Y:1993 | 04 | 1993 | INSTALL SET-BACK TIMERS | $1,773 | $500 | Implemented |
UD0414 # 03 Y:1993 | 03 | 1993 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,246 | $14,248 | Implemented |
UD0414 # 01 Y:1993 | 01 | 1993 | PAY UTILITY BILLS ON TIME | $2,100 | $0 | Implemented |
UD0042 # 06 Y:1982 | 06 | 1982 | USE FLUE GASES IN RADIANT HEATER FOR SPACE HEATING, OVENS, ETC | $866 | $4,000 | Implemented |
UD0042 # 05 Y:1982 | 05 | 1982 | REDUCE GLAZED AREAS IN BUILDINGS | $1,633 | $3,410 | Implemented |
UD0042 # 04 Y:1982 | 04 | 1982 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $2,997 | $0 | Implemented |
UD0042 # 03 Y:1982 | 03 | 1982 | INSTALL TIMERS AND/OR THERMOSTATS | $6,580 | $139 | Implemented |
UD0042 # 02 Y:1982 | 02 | 1982 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,870 | $1,450 | Implemented |
UD0042 # 01 Y:1982 | 01 | 1982 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $5,309 | $1,610 | Implemented |
UD0028 # 01 Y:1982 | 01 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $828 | $482 | Implemented |