IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

588

matching recommendations
Reset
SIC 3724 Aircraft Engines And Engine Parts
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0110 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $230 $400 Implemented
UF0110 # 04 Y:1995 04 1995 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $25,754 $0 Not Implemented
UF0110 # 05 Y:1995 05 1995 REPLACE ELECTRIC REHEAT WITH HEAT PIPES $19,763 $21,000 Not Implemented
UF0110 # 06 Y:1995 06 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $95 $284 Not Implemented
UD0414 # 01 Y:1993 01 1993 PAY UTILITY BILLS ON TIME $2,100 $0 Implemented
UD0414 # 02 Y:1993 02 1993 USE DEMAND CONTROLLER OR LOAD SHEDDER $20,700 $20,000 Not Implemented
UD0414 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,246 $14,248 Implemented
UD0414 # 04 Y:1993 04 1993 INSTALL SET-BACK TIMERS $1,773 $500 Implemented
UD0414 # 05 Y:1993 05 1993 INSTALL SET-BACK TIMERS $1,689 $1,500 Implemented
UD0414 # 06 Y:1993 06 1993 USE DEMAND CONTROLLER OR LOAD SHEDDER $3,519 $0 Not Implemented
MA0277 # 01 Y:1993 01 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $39,298 $39,650 Implemented
MA0277 # 02 Y:1993 02 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,123 $3,800 Implemented
MA0277 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,443 $5,557 Implemented
MA0277 # 04 Y:1993 04 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,397 $91 Implemented
MA0277 # 05 Y:1993 05 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $784 $180 Implemented
MA0277 # 06 Y:1993 06 1993 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $550 $126 Not Implemented
TN0482 # 01 Y:1993 01 1993 INSTALL SPECTRAL REFLECTORS / DELAMP $18,977 $30,900 n/a
TN0482 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,459 $1,504 n/a
TN0482 # 03 Y:1993 03 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,234 $600 n/a
TN0482 # 04 Y:1993 04 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $923 $185 n/a
TN0482 # 05 Y:1993 05 1993 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $277 $720 n/a
TN0482 # 06 Y:1993 06 1993 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,141 $0 n/a
ND0033 # 01 Y:1992 01 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,764 $7,603 Not Implemented
ND0033 # 02 Y:1992 02 1992 OPTIMIZE PLANT POWER FACTOR $10,415 $20,070 Implemented
ND0033 # 03 Y:1992 03 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,659 $8,523 Not Implemented