IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26

matching recommendations
Reset
SIC 3724 Aircraft Engines And Engine Parts
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0928 # 05 Y:2019 05 2019 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $2,682 $7,500 Not Implemented
GT0928 # 04 Y:2019 04 2019 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $3,786 $9,100 Not Implemented
GT0928 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,360 $33,097 Implemented
GT0928 # 02 Y:2019 02 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,605 $1,741 Implemented
GT0928 # 01 Y:2019 01 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $17,607 $950 Implemented
GT0863 # 05 Y:2009 05 2009 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $107,962 $125,000 Not Implemented
GT0863 # 04 Y:2009 04 2009 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $316,142 $180,000 Not Implemented
GT0863 # 03 Y:2009 03 2009 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $194,835 $180,000 Not Implemented
GT0863 # 02 Y:2009 02 2009 $24,150 $0 Not Implemented
GT0863 # 01 Y:2009 01 2009 REPAIR AND ELIMINATE STEAM LEAKS $3,847 $500 Not Implemented
GT0806 # 06 Y:2005 06 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $28,900 $135,800 Not Implemented
GT0806 # 08 Y:2005 08 2005 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $10,300 $13,870 Not Implemented
GT0806 # 07 Y:2005 07 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $26,000 $59,670 Not Implemented
GT0806 # 05 Y:2005 05 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,600 $2,613 Not Implemented
GT0806 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,300 $23,431 Not Implemented
GT0806 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,900 $52,200 Not Implemented
GT0806 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,230 $2,150 Implemented
GT0806 # 01 Y:2005 01 2005 INSULATE BARE EQUIPMENT $22,100 $2,782 Not Implemented
GT0625 # 01 Y:1997 01 1997 METER WASTE WATER $20,840 $0 Not Implemented
GT0625 # 08 Y:1997 08 1997 $743,700 $0 Implemented
GT0625 # 07 Y:1997 07 1997 UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID $26,000 $1,780 Not Implemented
GT0625 # 06 Y:1997 06 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,957 $5,695 Implemented
GT0625 # 05 Y:1997 05 1997 REDUCE VENTILATION AIR $8,640 $20,000 Not Implemented
GT0625 # 04 Y:1997 04 1997 FILTER AND REUSE HYDRAULIC OIL $19,800 $7,150 Implemented
GT0625 # 03 Y:1997 03 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,080 $400 Implemented