Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
31
matching recommendationsSIC | 3724 | Aircraft Engines And Engine Parts |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TA0066 # 09 Y:2003 | 09 | 2003 | USE IN-PROCESS RECYCLING WHENEVER POSSIBLE | $184 | $270 | Not Implemented |
TA0066 # 08 Y:2003 | 08 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $557 | $0 | Not Implemented |
TA0066 # 07 Y:2003 | 07 | 2003 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $668 | $0 | Implemented |
TA0066 # 06 Y:2003 | 06 | 2003 | USE IN-PROCESS RECYCLING WHENEVER POSSIBLE | $630 | $210 | Not Implemented |
TA0066 # 05 Y:2003 | 05 | 2003 | REPAIR AND ELIMINATE STEAM LEAKS | $893 | $0 | Implemented |
TA0066 # 04 Y:2003 | 04 | 2003 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,240 | $3,740 | Not Implemented |
TA0066 # 03 Y:2003 | 03 | 2003 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,854 | $0 | Implemented |
TA0066 # 02 Y:2003 | 02 | 2003 | DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS | $2,218 | $0 | Implemented |
TA0066 # 01 Y:2003 | 01 | 2003 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $29,101 | $28,080 | Implemented |
UU0053 # 06 Y:2003 | 06 | 2003 | INSTALL TURBULATORS | $2,610 | $1,572 | Not Implemented |
UU0053 # 05 Y:2003 | 05 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,869 | $2,340 | Implemented |
UU0053 # 04 Y:2003 | 04 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,112 | $70,635 | Not Implemented |
UU0053 # 03 Y:2003 | 03 | 2003 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,710 | $2,000 | Not Implemented |
UU0053 # 02 Y:2003 | 02 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $11,131 | $55 | Not Implemented |
UU0053 # 01 Y:2003 | 01 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,354 | $4,100 | Not Implemented |
OK0656 # 06 Y:2003 | 06 | 2003 | INSTALL OCCUPANCY SENSORS | $659 | $659 | Not Implemented |
OK0656 # 05 Y:2003 | 05 | 2003 | INSTALL SET-BACK TIMERS | $5,285 | $2,340 | Not Implemented |
OK0656 # 04 Y:2003 | 04 | 2003 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $16,663 | $1,000 | Not Implemented |
OK0656 # 03 Y:2003 | 03 | 2003 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $56,437 | $28,000 | Not Implemented |
OK0656 # 02 Y:2003 | 02 | 2003 | DISCONNECT BALLASTS | $3,785 | $315 | Not Implemented |
OK0656 # 01 Y:2003 | 01 | 2003 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $10,706 | $5,000 | Not Implemented |
OK0655 # 05 Y:2003 | 05 | 2003 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $5,749 | $25,000 | Not Implemented |
OK0655 # 04 Y:2003 | 04 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $38,818 | $30,499 | Not Implemented |
OK0655 # 03 Y:2003 | 03 | 2003 | REPLACE BOILER | $45,804 | $53,815 | n/a |
OK0655 # 02 Y:2003 | 02 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,168 | $1,300 | Not Implemented |