IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

717

matching recommendations
Reset
SIC 3728 Aircraft Parts And Equipment, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK1079 # 05 Y:2023 05 2023 OPTIMIZE PLANT POWER FACTOR $824 $3,200 Implemented
OK1079 # 04 Y:2023 04 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $763 $10,500 Implemented
OK1079 # 03 Y:2023 03 2023 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $5,711 $3,994 Implemented
OK1079 # 02 Y:2023 02 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $7,184 $0 Implemented
OK1079 # 01 Y:2023 01 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $800 $3,624 Implemented
OK1083 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $926 $2,799 Implemented
OK1083 # 03 Y:2023 03 2023 INSULATE BARE EQUIPMENT $29 $123 Implemented
UW2204 # 01 Y:2022 01 2022 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $6,178 $7,000 Implemented
UW2204 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,789 $13,171 Implemented
UW2204 # 03 Y:2022 03 2022 INSTALL OCCUPANCY SENSORS $11,216 $1,580 Implemented
UF0578 # 01 Y:2022 01 2022 USE DEMAND CONTROLLER OR LOAD SHEDDER $15,842 $11,742 Implemented
UF0578 # 03 Y:2022 03 2022 RECOVER WASTE HEAT FROM EQUIPMENT $9,829 $2,419 Implemented
UF0578 # 05 Y:2022 05 2022 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $7,688 $0 Implemented
UF0578 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,461 $390 Implemented
UF0578 # 07 Y:2022 07 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,930 $0 Implemented
UF0578 # 08 Y:2022 08 2022 INSTALL OCCUPANCY SENSORS $1,065 $1,710 Implemented
AS0517 # 07 Y:2022 07 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,256 $1,541 Implemented
AS0517 # 06 Y:2022 06 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,189 $859 Implemented
AS0517 # 04 Y:2022 04 2022 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $8,331 $39,600 Implemented
AS0517 # 03 Y:2022 03 2022 USE OPTIMUM THICKNESS INSULATION $10,522 $15,516 Implemented
CW0120 # 08 Y:2021 08 2021 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $217 $86 Implemented
CW0120 # 07 Y:2021 07 2021 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $1,000,000 $122,000 Implemented
CW0120 # 06 Y:2021 06 2021 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $899 $0 Implemented
CW0120 # 05 Y:2021 05 2021 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $1,965 $510 Implemented
CW0120 # 04 Y:2021 04 2021 MODIFY STARTUP/SHUTDOWN TIMES $2,380 $100,000 Implemented