Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,680
matching recommendationsSIC | 3728 | Aircraft Parts And Equipment, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK1109 # 05 Y:2024 | 05 | 2024 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $5,582 | $11,028 | n/a |
OK1109 # 04 Y:2024 | 04 | 2024 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $213 | $820 | n/a |
OK1109 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,162 | $3,598 | n/a |
OK1109 # 02 Y:2024 | 02 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $58,213 | $394,200 | n/a |
OK1109 # 01 Y:2024 | 01 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,576 | $44,000 | n/a |
UW2405 # 04 Y:2024 | 04 | 2024 | CROSS-TRAIN PERSONNEL TO AVOID LOST TIME | $150,000 | $200,000 | n/a |
UW2405 # 03 Y:2024 | 03 | 2024 | INSULATE BARE EQUIPMENT | $24,745 | $24,732 | n/a |
UW2405 # 02 Y:2024 | 02 | 2024 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $4,277 | $12,000 | n/a |
UW2405 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,834 | $25,000 | n/a |
MI0438 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $292,161 | $663,964 | n/a |
MI0438 # 02 Y:2024 | 02 | 2024 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $116,907 | $0 | n/a |
MI0438 # 03 Y:2024 | 03 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $52,928 | $1,320 | n/a |
MI0438 # 04 Y:2024 | 04 | 2024 | METER WASTE WATER | $26,088 | $956 | n/a |
MI0438 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,979 | $1,660 | n/a |
MI0438 # 06 Y:2024 | 06 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $9,248 | $860 | n/a |
MI0438 # 07 Y:2024 | 07 | 2024 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $2,582 | $1,027 | n/a |
MI0438 # 08 Y:2024 | 08 | 2024 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $2,139 | $40 | n/a |
OK1108 # 07 Y:2024 | 07 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $586 | $430 | n/a |
OK1108 # 06 Y:2024 | 06 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,784 | $906 | n/a |
OK1108 # 05 Y:2024 | 05 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $420 | $0 | n/a |
OK1108 # 04 Y:2024 | 04 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $405 | $503 | n/a |
OK1108 # 03 Y:2024 | 03 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $18,323 | $172,200 | n/a |
OK1108 # 02 Y:2024 | 02 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,075 | $1,600 | n/a |
OK1108 # 01 Y:2024 | 01 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,354 | $29,487 | n/a |
SJ0015 # 09 Y:2024 | 09 | 2024 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $146,431 | $0 | n/a |