IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,680

matching recommendations
Reset
SIC 3728 Aircraft Parts And Equipment, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0488 # 02 Y:2005 02 2005 OPTIMIZE PLANT POWER FACTOR $680 $2,000 Not Implemented
OR0488 # 03 Y:2005 03 2005 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $28,100 $132,000 Implemented
CO0572 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,460 $7,700 Not Implemented
CO0572 # 03 Y:2005 03 2005 USE SOLAR HEAT TO HEAT MAKE-UP AIR $2,480 $30,770 Not Implemented
CO0572 # 04 Y:2005 04 2005 INSTALL OCCUPANCY SENSORS $2,420 $7,570 Not Implemented
CO0572 # 05 Y:2005 05 2005 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,370 $1,000 Not Implemented
CO0572 # 06 Y:2005 06 2005 INSTALL OCCUPANCY SENSORS $560 $1,760 Not Implemented
CO0572 # 01 Y:2005 01 2005 INSTALL SKYLIGHTS $9,660 $40,800 Not Implemented
AS0405 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,884 $119,908 Not Implemented
AS0405 # 02 Y:2005 02 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,903 $1,000 Not Implemented
AS0405 # 03 Y:2005 03 2005 UPGRADE CONTROLS ON COMPRESSORS $7,610 $11,000 Not Implemented
AS0405 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,782 $4,000 Not Implemented
AS0405 # 05 Y:2005 05 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $5,719 $120 Not Implemented
AS0405 # 06 Y:2005 06 2005 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $867 $3,000 Not Implemented
AS0405 # 07 Y:2005 07 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $573 $612 Not Implemented
LM0104 # 01 Y:2005 01 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,080 $787 Implemented
LM0104 # 02 Y:2005 02 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $388 $300 Not Implemented
LM0104 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $920 $250 Not Implemented
LM0104 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,554 $7,000 Implemented
LM0104 # 05 Y:2005 05 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,769 $0 Not Implemented
UU0086 # 01 Y:2005 01 2005 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $8,056 $12,620 Not Implemented
UU0086 # 02 Y:2005 02 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,984 $6,400 Not Implemented
UU0086 # 03 Y:2005 03 2005 USE DEMAND CONTROLLER OR LOAD SHEDDER $17,445 $3,600 Not Implemented
UU0086 # 04 Y:2005 04 2005 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,447 $21,000 Not Implemented
UU0086 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $773 $4,320 Not Implemented