Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

245

matching recommendations
Reset
SIC 3728 Aircraft Parts And Equipment, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LM0054 # 07 Y:2003 07 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,472 $4,000 Not Implemented
LM0054 # 08 Y:2003 08 2003 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $316 $400 Implemented
LM0017 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,365 $300 Implemented
LM0017 # 02 Y:2001 02 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,880 $164 Not Implemented
LM0017 # 03 Y:2001 03 2001 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $48,865 $450 Implemented
LM0017 # 04 Y:2001 04 2001 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $409,752 $26,000 Implemented
LM0017 # 05 Y:2001 05 2001 DEVELOP STANDARD OPERATING PROCEDURES $540,000 $11,000 Implemented
LM0017 # 06 Y:2001 06 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $382,500 $6,000 Not Implemented
LM0022 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,734 $100 Implemented
LM0022 # 02 Y:2001 02 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,848 $164 Not Implemented
LM0022 # 03 Y:2001 03 2001 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $54,047 $450 Implemented
LM0022 # 04 Y:2001 04 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $28,008 $15,300 Not Implemented
LM0022 # 05 Y:2001 05 2001 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $57,000 $102,000 Implemented
SD0221 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,177 $3,752 Implemented
SD0221 # 02 Y:1999 02 1999 INSTALL SPECTRAL REFLECTORS / DELAMP $3,218 $3,060 Not Implemented
SD0221 # 03 Y:1999 03 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $50,303 $11,995 Not Implemented
SD0221 # 04 Y:1999 04 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,107 $0 Implemented
SD0221 # 05 Y:1999 05 1999 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,560 $1,560 Implemented
SD0221 # 06 Y:1999 06 1999 CONVERT TO AQUEOUS CLEANING SYSTEM $1,922 $1,922 Implemented
SD0221 # 07 Y:1999 07 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,002 $0 Implemented
SD0167 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,037 $3,300 Implemented
SD0167 # 02 Y:1997 02 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,700 $250 Implemented
SD0167 # 03 Y:1997 03 1997 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,973 $6,500 Implemented
SD0167 # 04 Y:1997 04 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,304 $0 Implemented
SD0167 # 05 Y:1997 05 1997 TURN OFF EQUIPMENT WHEN NOT IN USE $840 $0 Implemented