Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
245
matching recommendationsSIC | 3728 | Aircraft Parts And Equipment, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SJ0015 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $179,675 | $962,431 | n/a |
SJ0015 # 04 Y:2024 | 04 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,809 | $766 | n/a |
SJ0015 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,211 | $98 | n/a |
SJ0015 # 02 Y:2024 | 02 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,301 | $7,684 | n/a |
SJ0015 # 03 Y:2024 | 03 | 2024 | INSTALL OCCUPANCY SENSORS | $676 | $680 | n/a |
SJ0015 # 07 Y:2024 | 07 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,620 | $1,986 | n/a |
SJ0015 # 08 Y:2024 | 08 | 2024 | COMBINE UTILITY METERS | $1,748 | $0 | n/a |
SJ0015 # 09 Y:2024 | 09 | 2024 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $146,431 | $0 | n/a |
SJ0015 # 06 Y:2024 | 06 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,763 | $0 | n/a |
SD0648 # 03 Y:2024 | 03 | 2024 | INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM | $15,800 | $12,200 | Not Implemented |
SD0648 # 05 Y:2024 | 05 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $824,443 | $529,751 | Not Implemented |
SD0648 # 13 Y:2024 | 13 | 2024 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $793 | $1,336 | Implemented |
SD0648 # 10 Y:2024 | 10 | 2024 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $2,121 | $10,016 | Implemented |
SD0648 # 07 Y:2024 | 07 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $35,974 | $2,600 | Implemented |
SD0648 # 11 Y:2024 | 11 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $41,340 | $15,608 | Implemented |
SD0648 # 04 Y:2024 | 04 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $113,272 | $30,051 | Implemented |
SD0648 # 12 Y:2024 | 12 | 2024 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $982,749 | $783,575 | Not Implemented |
SD0648 # 06 Y:2024 | 06 | 2024 | USE BATTERY STORAGE FOR DEMAND CONTROL | $409,025 | $0 | Not Implemented |
SD0648 # 09 Y:2024 | 09 | 2024 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $364,878 | $49,250 | Not Implemented |
SD0648 # 01 Y:2024 | 01 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $22,994 | $4,000 | Implemented |
SD0648 # 08 Y:2024 | 08 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,384 | $2,234 | Implemented |
SD0648 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,906 | $4,828 | Implemented |
CI0019 # 08 Y:2023 | 08 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $851 | $1,500 | n/a |
CI0019 # 06 Y:2023 | 06 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,444 | $200 | n/a |
CI0019 # 05 Y:2023 | 05 | 2023 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $1,769 | $3,500 | n/a |