IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

29

matching recommendations
Reset
SIC 3728 Aircraft Parts And Equipment, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0302 # 06 Y:2002 06 2002 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,236 $665 Implemented
IA0302 # 05 Y:2002 05 2002 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $13,521 $5,000 Not Implemented
IA0302 # 04 Y:2002 04 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $409 $36 Not Implemented
IA0302 # 03 Y:2002 03 2002 INSTALL OCCUPANCY SENSORS $307 $333 Not Implemented
IA0302 # 02 Y:2002 02 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,323 $120 Not Implemented
IA0302 # 01 Y:2002 01 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,423 $6,500 Not Implemented
OK0640 # 03 Y:2002 03 2002 INSTALL OCCUPANCY SENSORS $1,022 $214 n/a
OK0640 # 02 Y:2002 02 2002 INSTALL SET-BACK TIMERS $8,851 $996 n/a
OK0640 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,949 $690 n/a
OK0640 # 04 Y:2002 04 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $583 $225 n/a
UD0645 # 07 Y:2002 07 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,965 $0 n/a
UD0645 # 01 Y:2002 01 2002 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $64,277 $3,300 n/a
UD0645 # 02 Y:2002 02 2002 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $28,640 $1,000 n/a
UD0645 # 03 Y:2002 03 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $13,252 $0 n/a
UD0645 # 04 Y:2002 04 2002 INSTALL TIMERS AND/OR THERMOSTATS $10,178 $2,325 n/a
UD0645 # 05 Y:2002 05 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,257 $363 n/a
UD0645 # 06 Y:2002 06 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,431 $7,030 n/a
UD0645 # 08 Y:2002 08 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,344 $2,000 n/a
UD0645 # 09 Y:2002 09 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $359 $30 n/a
UD0645 # 10 Y:2002 10 2002 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $207 $250 n/a
CO0501 # 06 Y:2002 06 2002 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $2,900 $0 Not Implemented
CO0501 # 05 Y:2002 05 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $3,440 $2,000 Not Implemented
CO0501 # 04 Y:2002 04 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $5,020 $2,000 Not Implemented
CO0501 # 03 Y:2002 03 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $9,180 $10,000 Not Implemented
CO0501 # 02 Y:2002 02 2002 INSULATE BARE EQUIPMENT $11,610 $1,980 Not Implemented