IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

39

matching recommendations
Reset
SIC 3728 Aircraft Parts And Equipment, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0551 # 07 Y:2004 07 2004 INSTALL OCCUPANCY SENSORS $140 $390 Not Implemented
CO0551 # 06 Y:2004 06 2004 INSTALL OCCUPANCY SENSORS $510 $300 Not Implemented
CO0551 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,300 $13,550 Not Implemented
CO0551 # 04 Y:2004 04 2004 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $190 $750 Not Implemented
CO0551 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $910 $320 Implemented
CO0551 # 02 Y:2004 02 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,230 $60 Implemented
CO0551 # 01 Y:2004 01 2004 RECOVER WASTE HEAT FROM EQUIPMENT $1,340 $4,280 Not Implemented
OR0466 # 03 Y:2004 03 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $220 $0 Not Implemented
OR0466 # 01 Y:2004 01 2004 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $9,000 $21,000 Implemented
OR0466 # 02 Y:2004 02 2004 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,250 $330 Not Implemented
MI0083 # 02 Y:2004 02 2004 $1,951 $50 Implemented
MI0083 # 01 Y:2004 01 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $19,455 $0 Not Implemented
MI0083 # 05 Y:2004 05 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,493 $2,670 Implemented
MI0083 # 04 Y:2004 04 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,084 $800 Implemented
MI0083 # 03 Y:2004 03 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,767 $3,000 Implemented
MI0080 # 01 Y:2004 01 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $9,571 $10,600 Not Implemented
MI0080 # 02 Y:2004 02 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $7,438 $2,300 Implemented
MI0080 # 03 Y:2004 03 2004 $93,161 $57,760 Not Implemented
MI0080 # 04 Y:2004 04 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,222 $160 Implemented
MI0080 # 05 Y:2004 05 2004 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $822 $60 Implemented
UU0060 # 07 Y:2004 07 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $4,897 $200 Implemented
UU0060 # 01 Y:2004 01 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,202 $13,200 Implemented
UU0060 # 05 Y:2004 05 2004 INSULATE BARE EQUIPMENT $309 $723 Not Implemented
UU0060 # 04 Y:2004 04 2004 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $3,047 $2,600 Not Implemented
UU0060 # 03 Y:2004 03 2004 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $5,059 $4,000 Implemented