IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

77

matching recommendations
Reset
SIC 3728 Aircraft Parts And Equipment, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0721 # 01 Y:2013 01 2013 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $15,477 $1,400 Not Implemented
MA0721 # 02 Y:2013 02 2013 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $10,906 $7,500 Implemented
MA0721 # 03 Y:2013 03 2013 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,493 $11,000 Implemented
MA0721 # 04 Y:2013 04 2013 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $4,864 $200 Implemented
MA0721 # 05 Y:2013 05 2013 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,474 $200 Implemented
MA0721 # 06 Y:2013 06 2013 REPAIR AND ELIMINATE STEAM LEAKS $2,358 $1,120 Implemented
MA0721 # 07 Y:2013 07 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,130 $1,020 Implemented
MA0721 # 08 Y:2013 08 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,106 $6,390 Not Implemented
MA0721 # 09 Y:2013 09 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $1,465 $1,650 Not Implemented
OR0620 # 05 Y:2013 05 2013 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $584 $2,554 Not Implemented
OR0620 # 04 Y:2013 04 2013 MODIFY STARTUP/SHUTDOWN TIMES $442 $481 Not Implemented
OR0620 # 03 Y:2013 03 2013 INSULATE BARE EQUIPMENT $456 $163 Not Implemented
OR0620 # 02 Y:2013 02 2013 REDUCE VENTILATION AIR $28,525 $3,200 Not Implemented
OR0620 # 01 Y:2013 01 2013 PURCHASE EQUIPMENT INSTEAD OF LEASING $50,574 $68,750 Not Implemented
OR0619 # 01 Y:2013 01 2013 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $7,073 $2,342 Not Implemented
OR0619 # 06 Y:2013 06 2013 RECOVER WASTE HEAT FROM EQUIPMENT $4,550 $13,225 Not Implemented
OR0619 # 05 Y:2013 05 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,667 $2,342 Not Implemented
OR0619 # 04 Y:2013 04 2013 RECOVER WASTE HEAT FROM EQUIPMENT $679 $1,677 Not Implemented
OR0619 # 03 Y:2013 03 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,300 $50,000 Not Implemented
OR0619 # 02 Y:2013 02 2013 REDUCE FLUID FLOW RATES $2,879 $6,200 Not Implemented
MA0713 # 01 Y:2013 01 2013 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $7,896 $22,000 Not Implemented
MA0713 # 02 Y:2013 02 2013 REDUCE VENTILATION AIR $7,745 $500 Implemented
MA0713 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,837 $1,720 Implemented
MA0713 # 04 Y:2013 04 2013 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,564 $16,800 Not Implemented
MA0713 # 03 Y:2013 03 2013 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $7,547 $44,500 Not Implemented