IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

811

matching recommendations
Reset
SIC 373 Ship And Boat Building And Repairing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LS2309 # 05 Y:2023 05 2023 INSTALL OCCUPANCY SENSORS $642 $521 Implemented
LS2309 # 04 Y:2023 04 2023 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,393 $125 Not Implemented
LS2309 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,547 $180 Implemented
LS2309 # 02 Y:2023 02 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $8,938 $225 Implemented
LS2309 # 01 Y:2023 01 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $8,886 $0 Implemented
LT8372 # 04 Y:2023 04 2023 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $878 $2,730 Not Implemented
LT8372 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,768 $200 Implemented
LT8372 # 02 Y:2023 02 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,572 $255 Not Implemented
LT8372 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,621 $3,316 Not Implemented
LE0531 # 01 Y:2022 01 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $130,874 $22,000 Not Implemented
LE0531 # 02 Y:2022 02 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $84,178 $47,500 Not Implemented
LE0531 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $330,596 $199,875 Not Implemented
LE0531 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $49,409 $33,000 Not Implemented
LE0531 # 05 Y:2022 05 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,036 $10,414 Not Implemented
LE0531 # 06 Y:2022 06 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $88,444 $135,000 Not Implemented
MZ0306 # 07 Y:2022 07 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $8,283 $9,100 Not Implemented
MZ0306 # 06 Y:2022 06 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $640 $160 Not Implemented
MZ0306 # 05 Y:2022 05 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,459 $17,421 Not Implemented
MZ0306 # 04 Y:2022 04 2022 INSTALL OCCUPANCY SENSORS $247 $870 Implemented
MZ0306 # 03 Y:2022 03 2022 RECOVER WASTE HEAT FROM EQUIPMENT $35,350 $30,500 Not Implemented
MZ0306 # 01 Y:2022 01 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $15,617 $50,190 Not Implemented
MZ0306 # 02 Y:2022 02 2022 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $4,781 $18,650 Not Implemented
TT0270 # 07 Y:2022 07 2022 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $881 $1,200 Not Implemented
TT0270 # 06 Y:2022 06 2022 USE SOLAR HEAT FOR HEAT $1,092 $4,800 Not Implemented
TT0270 # 05 Y:2022 05 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,201 $2,240 Not Implemented