Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
798
matching recommendationsSIC | 373 | Ship And Boat Building And Repairing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0437 # 03 Y:2017 | 03 | 2017 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $37,770 | $36,000 | Not Implemented |
LE0437 # 04 Y:2017 | 04 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,482 | $14,000 | Not Implemented |
LE0437 # 05 Y:2017 | 05 | 2017 | INCREASE ELECTRICAL CONDUCTOR SIZE TO REDUCE DISTRIBUTION LOSSES | $35,693 | $50,000 | Not Implemented |
LE0437 # 06 Y:2017 | 06 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,862 | $12,000 | Not Implemented |
LE0437 # 07 Y:2017 | 07 | 2017 | CONSIDER POWER LOSS AS WELL AS INITIAL LOADS AND LOAD GROWTH IN DOWN-SIZING TRANSFORMERS | $86,210 | $200,000 | Not Implemented |
LE0437 # 08 Y:2017 | 08 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $21,363 | $60,000 | Not Implemented |
NC0529 # 09 Y:2014 | 09 | 2014 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $38 | $63 | Implemented |
NC0529 # 08 Y:2014 | 08 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $399 | $200 | Implemented |
NC0529 # 07 Y:2014 | 07 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $764 | $1,600 | Not Implemented |
NC0529 # 06 Y:2014 | 06 | 2014 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,318 | $1,500 | Not Implemented |
NC0529 # 05 Y:2014 | 05 | 2014 | INSTALL OCCUPANCY SENSORS | $766 | $400 | Not Implemented |
NC0529 # 04 Y:2014 | 04 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,169 | $272 | Not Implemented |
NC0529 # 03 Y:2014 | 03 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,205 | $16,872 | Implemented |
NC0529 # 02 Y:2014 | 02 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,143 | $1,156 | Implemented |
NC0529 # 01 Y:2014 | 01 | 2014 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $60,000 | $40,000 | Not Implemented |
MI0266 # 01 Y:2014 | 01 | 2014 | USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES | $12,844 | $14,320 | Not Implemented |
MI0266 # 02 Y:2014 | 02 | 2014 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $8,400 | $800 | Implemented |
MI0266 # 03 Y:2014 | 03 | 2014 | USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES | $7,871 | $640 | Implemented |
MI0266 # 04 Y:2014 | 04 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,868 | $3,500 | Not Implemented |
MI0266 # 05 Y:2014 | 05 | 2014 | INSTALL SKYLIGHTS | $5,746 | $630 | Implemented |
MI0266 # 06 Y:2014 | 06 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,486 | $1,310 | Implemented |
MI0266 # 07 Y:2014 | 07 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,344 | $9,120 | Implemented |
MI0266 # 08 Y:2014 | 08 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,899 | $80 | Implemented |
MI0266 # 09 Y:2014 | 09 | 2014 | USE PHOTOCELL CONTROLS | $1,450 | $360 | Implemented |
MI0264 # 21 Y:2014 | 21 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $485 | $80 | Not Implemented |