IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

245

matching recommendations
Reset
SIC 3731 Ship Building And Repairing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LS1802 # 05 Y:2018 05 2018 INSTALL OCCUPANCY SENSORS $159 $550 Implemented
LS1802 # 02 Y:2018 02 2018 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $1,300 $200 Implemented
LS1802 # 03 Y:2018 03 2018 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $4,166 $2,667 Not Implemented
LS1802 # 01 Y:2018 01 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $379 $0 Implemented
LS1802 # 04 Y:2018 04 2018 USE PHOTOCELL CONTROLS $427 $400 Implemented
LE0437 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,208 $20,000 Not Implemented
LE0437 # 01 Y:2017 01 2017 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $12,220 $7,000 Not Implemented
LE0437 # 06 Y:2017 06 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,862 $12,000 Not Implemented
LE0437 # 03 Y:2017 03 2017 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $37,770 $36,000 Not Implemented
LE0437 # 04 Y:2017 04 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,482 $14,000 Not Implemented
LE0437 # 05 Y:2017 05 2017 INCREASE ELECTRICAL CONDUCTOR SIZE TO REDUCE DISTRIBUTION LOSSES $35,693 $50,000 Not Implemented
LE0437 # 08 Y:2017 08 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $21,363 $60,000 Not Implemented
LE0437 # 07 Y:2017 07 2017 CONSIDER POWER LOSS AS WELL AS INITIAL LOADS AND LOAD GROWTH IN DOWN-SIZING TRANSFORMERS $86,210 $200,000 Not Implemented
LL0354 # 10 Y:2011 10 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $120 $70 Not Implemented
LL0354 # 08 Y:2011 08 2011 USE PHOTOCELL CONTROLS $590 $30 Not Implemented
LL0354 # 06 Y:2011 06 2011 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,139 $490 Not Implemented
LL0354 # 01 Y:2011 01 2011 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $118,318 $14,310 Implemented
LL0354 # 09 Y:2011 09 2011 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $155 $184 Not Implemented
LL0354 # 03 Y:2011 03 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $26,279 $60 Implemented
LL0354 # 07 Y:2011 07 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $753 $314 Not Implemented
LL0354 # 05 Y:2011 05 2011 INSTALL OCCUPANCY SENSORS $1,682 $6,180 Not Implemented
LL0354 # 04 Y:2011 04 2011 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $8,821 $1,830 Not Implemented
LL0354 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $43,188 $6,720 Implemented
LL0353 # 07 Y:2011 07 2011 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $270 $88 Not Implemented
LL0353 # 06 Y:2011 06 2011 INSTALL OCCUPANCY SENSORS $594 $2,275 Not Implemented