IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

562

matching recommendations
Reset
SIC 3732 Boat Building And Repairing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MU0047 # 09 Y:2024 09 2024 INSTALL SET-BACK TIMERS $41,716 $119,375 n/a
MU0047 # 17 Y:2024 17 2024 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,296 $25,585 n/a
MU0047 # 03 Y:2024 03 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,582 $6,438 n/a
MU0041 # 06 Y:2023 06 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $20,235 $100,548 Implemented
MU0041 # 01 Y:2023 01 2023 INSTALL AUTOMATIC STACK DAMPER $4,161 $959 Implemented
MU0041 # 10 Y:2023 10 2023 USE RADIANT HEATER FOR SPOT HEATING $4,201 $33,470 Not Implemented
MU0041 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $673 $240 Implemented
MU0041 # 07 Y:2023 07 2023 INSTALL SET-BACK TIMERS $86,283 $371,500 Implemented
MU0041 # 02 Y:2023 02 2023 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $1,074 $844 Not Implemented
MU0041 # 03 Y:2023 03 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $26,806 $25,843 Implemented
MU0041 # 11 Y:2023 11 2023 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $2,870 $5,510 Not Implemented
MU0041 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,396 $6,403 Implemented
MU0041 # 09 Y:2023 09 2023 INSTALL OCCUPANCY SENSORS $270 $189 Not Implemented
MU0041 # 08 Y:2023 08 2023 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,605 $0 Implemented
MU0041 # 12 Y:2023 12 2023 UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS $4,105 $5,076 Implemented
MZ0306 # 02 Y:2022 02 2022 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $4,781 $18,650 Not Implemented
MZ0306 # 03 Y:2022 03 2022 RECOVER WASTE HEAT FROM EQUIPMENT $35,350 $30,500 Not Implemented
MZ0306 # 07 Y:2022 07 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $8,283 $9,100 Not Implemented
MZ0306 # 06 Y:2022 06 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $640 $160 Not Implemented
MZ0306 # 05 Y:2022 05 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,459 $17,421 Not Implemented
MZ0306 # 04 Y:2022 04 2022 INSTALL OCCUPANCY SENSORS $247 $870 Implemented
MZ0306 # 01 Y:2022 01 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $15,617 $50,190 Not Implemented
TT0270 # 04 Y:2022 04 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,829 $40 Not Implemented
TT0270 # 07 Y:2022 07 2022 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $881 $1,200 Not Implemented
TT0270 # 02 Y:2022 02 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $5,525 $50 Implemented