IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

562

matching recommendations
Reset
SIC 3732 Boat Building And Repairing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0157 # 02 Y:2007 02 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,557 $1,210 Not Implemented
MI0157 # 03 Y:2007 03 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,187 $40 Not Implemented
MI0157 # 04 Y:2007 04 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,330 $1,210 Not Implemented
MI0157 # 05 Y:2007 05 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,639 $40 Not Implemented
MI0157 # 06 Y:2007 06 2007 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $3,802 $3,475 Not Implemented
MI0157 # 07 Y:2007 07 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,172 $1,210 Not Implemented
MI0157 # 08 Y:2007 08 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,540 $40 Not Implemented
MI0157 # 09 Y:2007 09 2007 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,765 $3,475 Not Implemented
MI0157 # 10 Y:2007 10 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,435 $1,210 Not Implemented
UF0405 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $47,407 $51,387 Implemented
UF0405 # 02 Y:2007 02 2007 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $4,716 $834 Not Implemented
UF0405 # 03 Y:2007 03 2007 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $5,532 $545 Implemented
UF0405 # 04 Y:2007 04 2007 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $8,668 $0 Implemented
UF0405 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,530 $1,396 Implemented
UF0405 # 06 Y:2007 06 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $19,272 $0 Implemented
UF0405 # 07 Y:2007 07 2007 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $49,615 $42,263 Not Implemented
UF0405 # 08 Y:2007 08 2007 INSTALL TIMERS AND/OR THERMOSTATS $3,895 $542 Implemented
UF0405 # 09 Y:2007 09 2007 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $1,037 $12 Implemented
UF0405 # 10 Y:2007 10 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $44,942 $29,100 Not Implemented
UF0405 # 11 Y:2007 11 2007 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $33,577 $25,436 Not Implemented
UF0405 # 12 Y:2007 12 2007 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $595 $3,486 Not Implemented
UF0405 # 13 Y:2007 13 2007 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,175 $8,000 Not Implemented
WI0510 # 01 Y:2006 01 2006 INSTALL TIMERS AND/OR THERMOSTATS $12,014 $0 Implemented
WI0510 # 02 Y:2006 02 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,865 $2,000 Not Implemented
WI0510 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,944 $23,000 Implemented