IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

275

matching recommendations
Reset
SIC 374 Railroad Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0451 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,062 $5,773 Implemented
WV0451 # 02 Y:2012 02 2012 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $6,271 $1,000 Not Implemented
WV0451 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,277 $41,953 Not Implemented
WV0451 # 15 Y:2012 15 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,001 $467 Not Implemented
WV0451 # 16 Y:2012 16 2012 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $783 $70 Implemented
SF0377 # 08 Y:2009 08 2009 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,116 $25,320 Not Implemented
SF0377 # 07 Y:2009 07 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,453 $38,867 Not Implemented
SF0377 # 06 Y:2009 06 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,529 $30,407 Not Implemented
SF0377 # 05 Y:2009 05 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $977 $4,281 Not Implemented
SF0377 # 04 Y:2009 04 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $209 $587 Not Implemented
SF0377 # 03 Y:2009 03 2009 USE RADIANT HEATER FOR SPOT HEATING $1,094 $2,088 Not Implemented
SF0377 # 02 Y:2009 02 2009 INSTALL OCCUPANCY SENSORS $1,657 $1,518 Not Implemented
SF0377 # 01 Y:2009 01 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,324 $0 Implemented
LE0281 # 08 Y:2008 08 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $696 $800 Not Implemented
LE0281 # 01 Y:2008 01 2008 USE RADIANT HEATER FOR SPOT HEATING $9,502 $3,600 Not Implemented
LE0281 # 09 Y:2008 09 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $670 $120 Not Implemented
LE0281 # 10 Y:2008 10 2008 USE SYNTHETIC LUBRICANT $508 $500 Not Implemented
LE0281 # 11 Y:2008 11 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,106 $34,067 Not Implemented
LE0281 # 12 Y:2008 12 2008 INSTALL OCCUPANCY SENSORS $3,557 $780 Not Implemented
LE0281 # 07 Y:2008 07 2008 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $831 $1,200 Not Implemented
LE0281 # 05 Y:2008 05 2008 RECOVER WASTE HEAT FROM EQUIPMENT $1,306 $1,000 Not Implemented
LE0281 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,477 $1,790 Implemented
LE0281 # 03 Y:2008 03 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,659 $5,000 Not Implemented
LE0281 # 04 Y:2008 04 2008 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,441 $2,500 Implemented
LE0281 # 06 Y:2008 06 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $923 $240 Implemented