Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
150
matching recommendationsSIC | 374 | Railroad Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0707 # 02 Y:2004 | 02 | 2004 | COVER OPEN TANKS | $27,270 | $4,326 | Implemented |
UD0707 # 01 Y:2004 | 01 | 2004 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $63,251 | $782 | Not Implemented |
UD0707 # 09 Y:2004 | 09 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $272 | $750 | Not Implemented |
UD0707 # 08 Y:2004 | 08 | 2004 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $827 | $1,000 | Not Implemented |
UD0707 # 07 Y:2004 | 07 | 2004 | INSTALL OCCUPANCY SENSORS | $1,158 | $245 | Implemented |
UD0707 # 06 Y:2004 | 06 | 2004 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $4,078 | $15,000 | Not Implemented |
UD0707 # 05 Y:2004 | 05 | 2004 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $6,960 | $0 | Not Implemented |
UD0707 # 04 Y:2004 | 04 | 2004 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $11,671 | $46,000 | Not Implemented |
UD0707 # 03 Y:2004 | 03 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,956 | $31,342 | Implemented |
CO0550 # 11 Y:2004 | 11 | 2004 | PAY BILLS ON TIME TO AVOID LATE FEES | $390 | $0 | Implemented |
CO0550 # 10 Y:2004 | 10 | 2004 | ADD AREA LIGHTING SWITCHES | $2,070 | $4,850 | Implemented |
CO0550 # 09 Y:2004 | 09 | 2004 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $2,210 | $17,000 | Not Implemented |
CO0550 # 08 Y:2004 | 08 | 2004 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $2,570 | $1,000 | Implemented |
CO0550 # 01 Y:2004 | 01 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,960 | $2,000 | Implemented |
CO0550 # 07 Y:2004 | 07 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,040 | $77,000 | Not Implemented |
CO0550 # 06 Y:2004 | 06 | 2004 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $6,160 | $23,870 | Not Implemented |
CO0550 # 05 Y:2004 | 05 | 2004 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $490 | $0 | Not Implemented |
CO0550 # 04 Y:2004 | 04 | 2004 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $590 | $3,520 | Implemented |
CO0550 # 03 Y:2004 | 03 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,000 | $180 | Implemented |
CO0550 # 02 Y:2004 | 02 | 2004 | DISTILL CONTAMINATED SOLVENTS FOR REUSE | $1,720 | $6,070 | Not Implemented |
SU0134 # 04 Y:2002 | 04 | 2002 | REPAIR AND ELIMINATE STEAM LEAKS | $4,103 | $178 | Not Implemented |
SU0134 # 02 Y:2002 | 02 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,420 | $89 | Implemented |
SU0134 # 01 Y:2002 | 01 | 2002 | INSTALL / REPAIR INSULATION ON STEAM LINES | $14,024 | $6,613 | Not Implemented |
SU0134 # 05 Y:2002 | 05 | 2002 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,031 | $706 | Not Implemented |
SU0134 # 03 Y:2002 | 03 | 2002 | OPTIMIZE PLANT POWER FACTOR | $8,470 | $23,250 | Not Implemented |