IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

272

matching recommendations
Reset
SIC 3743 Railroad Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0451 # 13 Y:2012 13 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,600 $2,500 Implemented
WV0451 # 06 Y:2012 06 2012 INSULATE BARE EQUIPMENT $3,732 $1,737 Implemented
WV0451 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,858 $380 Implemented
WV0451 # 04 Y:2012 04 2012 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $4,597 $27,000 Not Implemented
WV0451 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,062 $5,773 Implemented
WV0451 # 02 Y:2012 02 2012 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $6,271 $1,000 Not Implemented
WV0451 # 12 Y:2012 12 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,612 $1,260 Not Implemented
WV0451 # 11 Y:2012 11 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,982 $9,000 Not Implemented
WV0451 # 10 Y:2012 10 2012 DEVELOP A REPAIR/REPLACE POLICY $2,628 $640 Not Implemented
WV0451 # 09 Y:2012 09 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,705 $9,700 Not Implemented
WV0451 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,277 $41,953 Not Implemented
SF0377 # 01 Y:2009 01 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,324 $0 Implemented
SF0377 # 02 Y:2009 02 2009 INSTALL OCCUPANCY SENSORS $1,657 $1,518 Not Implemented
SF0377 # 03 Y:2009 03 2009 USE RADIANT HEATER FOR SPOT HEATING $1,094 $2,088 Not Implemented
SF0377 # 04 Y:2009 04 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $209 $587 Not Implemented
SF0377 # 05 Y:2009 05 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $977 $4,281 Not Implemented
SF0377 # 08 Y:2009 08 2009 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,116 $25,320 Not Implemented
SF0377 # 07 Y:2009 07 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,453 $38,867 Not Implemented
SF0377 # 06 Y:2009 06 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,529 $30,407 Not Implemented
LE0281 # 01 Y:2008 01 2008 USE RADIANT HEATER FOR SPOT HEATING $9,502 $3,600 Not Implemented
LE0281 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,477 $1,790 Implemented
LE0281 # 03 Y:2008 03 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,659 $5,000 Not Implemented
LE0281 # 12 Y:2008 12 2008 INSTALL OCCUPANCY SENSORS $3,557 $780 Not Implemented
LE0281 # 11 Y:2008 11 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,106 $34,067 Not Implemented
LE0281 # 04 Y:2008 04 2008 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,441 $2,500 Implemented