IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

354

matching recommendations
Reset
SIC 379 Miscellaneous Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0890 # 04 Y:2013 04 2013 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $136,711 $0 Implemented
UD0890 # 03 Y:2013 03 2013 CHECK FOR ACCURACY OF UTILITY / POWER METERS $37,340 $0 Implemented
UD0890 # 02 Y:2013 02 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,847 $0 Not Implemented
UD0890 # 01 Y:2013 01 2013 BURN A LESS EXPENSIVE GRADE OF FUEL $544,478 $0 Implemented
TT0106 # 01 Y:2013 01 2013 OPTIMIZE PLANT POWER FACTOR $8,613 $37,637 Not Implemented
TT0106 # 02 Y:2013 02 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,063 $720 Implemented
TT0106 # 03 Y:2013 03 2013 INSTALL SPECTRAL REFLECTORS / DELAMP $1,763 $5,520 Not Implemented
TT0106 # 04 Y:2013 04 2013 INSTALL SPECTRAL REFLECTORS / DELAMP $2,586 $9,280 Not Implemented
UA0089 # 05 Y:2012 05 2012 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $124,000 $150,000 Not Implemented
UA0089 # 01 Y:2012 01 2012 INSTALL TIMERS AND/OR THERMOSTATS $7,437 $680 Implemented
UA0089 # 02 Y:2012 02 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,625 $200 Implemented
UA0089 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,506 $1,550 Not Implemented
UA0089 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $34,674 $51,251 Not Implemented
BS0007 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,760 $649 Implemented
BS0007 # 03 Y:2012 03 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $98 $0 Not Implemented
BS0007 # 04 Y:2012 04 2012 INSTALL OCCUPANCY SENSORS $186 $300 Not Implemented
BS0007 # 05 Y:2012 05 2012 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,845 $6,260 Not Implemented
BS0007 # 06 Y:2012 06 2012 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $3,204 $7,725 Not Implemented
BS0007 # 01 Y:2012 01 2012 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $1,790 $4,911 Not Implemented
UM0375 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $126,231 $236,764 Implemented
UM0375 # 02 Y:2010 02 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $16,709 $4,000 Implemented
UM0375 # 03 Y:2010 03 2010 INSTALL OCCUPANCY SENSORS $7,646 $4,232 Implemented
UM0375 # 04 Y:2010 04 2010 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $27,796 $140,490 Implemented
UM0375 # 05 Y:2010 05 2010 RECOVER WASTE HEAT FROM EQUIPMENT $16,802 $5,500 Implemented
UD0764 # 01 Y:2007 01 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $101,033 $243,645 Not Implemented