Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
127
matching recommendationsSIC | 3792 | Travel Trailers And Campers |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BS0007 # 01 Y:2012 | 01 | 2012 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $1,790 | $4,911 | Not Implemented |
BS0007 # 02 Y:2012 | 02 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,760 | $649 | Implemented |
BS0007 # 03 Y:2012 | 03 | 2012 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $98 | $0 | Not Implemented |
BS0007 # 04 Y:2012 | 04 | 2012 | INSTALL OCCUPANCY SENSORS | $186 | $300 | Not Implemented |
BS0007 # 05 Y:2012 | 05 | 2012 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $1,845 | $6,260 | Not Implemented |
BS0007 # 06 Y:2012 | 06 | 2012 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $3,204 | $7,725 | Not Implemented |
UD0764 # 07 Y:2007 | 07 | 2007 | INSTALL OCCUPANCY SENSORS | $3,230 | $760 | Implemented |
UD0764 # 02 Y:2007 | 02 | 2007 | INSULATE BARE EQUIPMENT | $35,952 | $98,336 | Implemented |
UD0764 # 01 Y:2007 | 01 | 2007 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $101,033 | $243,645 | Not Implemented |
UD0764 # 08 Y:2007 | 08 | 2007 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,437 | $0 | Implemented |
UD0764 # 05 Y:2007 | 05 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,675 | $1,275 | Implemented |
UD0764 # 04 Y:2007 | 04 | 2007 | OPTIMIZE PLANT POWER FACTOR | $24,334 | $6,000 | Not Implemented |
UD0764 # 03 Y:2007 | 03 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,818 | $49,600 | Implemented |
UD0764 # 06 Y:2007 | 06 | 2007 | INSTALL REPLACEMENT DOORS | $6,223 | $13,000 | Not Implemented |
OR0413 # 03 Y:2002 | 03 | 2002 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $142,400 | $25,000 | n/a |
OR0413 # 05 Y:2002 | 05 | 2002 | MODIFY WORKLOAD | $1,250,300 | $29,300 | n/a |
OR0413 # 02 Y:2002 | 02 | 2002 | CROSS-TRAIN PERSONNEL TO AVOID LOST TIME | $214,000 | $5,000 | Implemented |
OR0413 # 06 Y:2002 | 06 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $220 | $50 | Implemented |
OR0413 # 01 Y:2002 | 01 | 2002 | EXPAND OPERATIONS INTO UNUSED SPACE | $10,000 | $1,200 | Not Implemented |
OR0413 # 04 Y:2002 | 04 | 2002 | MOVE PRODUCT USING MECHANICAL MEANS | $3,500 | $2,800 | Not Implemented |
UU0006 # 01 Y:2001 | 01 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,732 | $461 | Not Implemented |
UU0006 # 02 Y:2001 | 02 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,664 | $215 | Implemented |
UU0006 # 04 Y:2001 | 04 | 2001 | USE SYNTHETIC LUBRICANT | $378 | $300 | Implemented |
UU0006 # 03 Y:2001 | 03 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $483 | $462 | Implemented |
UU0006 # 05 Y:2001 | 05 | 2001 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $417 | $388 | Not Implemented |