Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,206
matching recommendationsSIC | 38 | Instruments And Related Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1101 # 04 Y:2025 | 04 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,619 | $1,015 | n/a |
MI0454 # 02 Y:2024 | 02 | 2024 | USE OPTIMUM TEMPERATURE | $31,534 | $960 | n/a |
MI0454 # 03 Y:2024 | 03 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $10,560 | $7,300 | n/a |
UD1101 # 02 Y:2025 | 02 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $9,997 | $6,792 | n/a |
UD1101 # 06 Y:2025 | 06 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,266 | $952 | n/a |
MI0454 # 05 Y:2024 | 05 | 2024 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $905 | $4,156 | n/a |
UD1101 # 10 Y:2025 | 10 | 2025 | INSTALL OCCUPANCY SENSORS | $94 | $0 | n/a |
MI0454 # 04 Y:2024 | 04 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,118 | $11,168 | n/a |
UD1101 # 03 Y:2025 | 03 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,750 | $7,500 | n/a |
UD1101 # 08 Y:2025 | 08 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $430 | $1,040 | n/a |
MI0454 # 06 Y:2024 | 06 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $78,625 | $364,596 | n/a |
UD1101 # 01 Y:2025 | 01 | 2025 | TURN OFF EQUIPMENT WHEN NOT IN USE | $8,143 | $0 | n/a |
MI0454 # 01 Y:2024 | 01 | 2024 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,818 | $0 | n/a |
MI0454 # 07 Y:2024 | 07 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $22,309 | $111,252 | n/a |
UD1101 # 05 Y:2025 | 05 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,284 | $0 | n/a |
UD1101 # 11 Y:2025 | 11 | 2025 | OPTIMIZE PLANT POWER FACTOR | $1,101 | $4,400 | n/a |
UD1101 # 07 Y:2025 | 07 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,622 | $4,975 | n/a |
UD1101 # 09 Y:2025 | 09 | 2025 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $310 | $1,350 | n/a |
AS0597 # 02 Y:2024 | 02 | 2024 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $35,049 | $583 | n/a |
AS0597 # 07 Y:2024 | 07 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $710 | $225 | n/a |
AS0597 # 06 Y:2024 | 06 | 2024 | INSTALL SPECTRAL REFLECTORS / DELAMP | $888 | $389 | n/a |
AS0597 # 03 Y:2024 | 03 | 2024 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $6,087 | $583 | n/a |
AS0597 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $35,454 | $296,882 | n/a |
AS0597 # 04 Y:2024 | 04 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,605 | $9,885 | n/a |
AS0597 # 05 Y:2024 | 05 | 2024 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $2,499 | $3,310 | n/a |