IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,872

matching recommendations
Reset
SIC 38 Instruments And Related Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0468 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,463 $29,680 Implemented
WV0468 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,596 $31,932 Implemented
MA0708 # 03 Y:2013 03 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $3,140 $400 Implemented
MA0708 # 04 Y:2013 04 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,828 $3,200 Implemented
UK1310 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,458 $1,500 Implemented
UK1310 # 03 Y:2013 03 2013 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $418 $870 Implemented
UK1310 # 04 Y:2013 04 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $348 $60 Implemented
MI0237 # 01 Y:2013 01 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $22,474 $10,160 Implemented
MI0237 # 02 Y:2013 02 2013 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,857 $80 Implemented
MI0237 # 04 Y:2013 04 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,086 $80 Implemented
MI0237 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,565 $1,660 Implemented
MI0237 # 06 Y:2013 06 2013 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,104 $2,406 Implemented
MI0237 # 07 Y:2013 07 2013 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $1,045 $40 Implemented
MI0237 # 08 Y:2013 08 2013 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $714 $205 Implemented
MI0237 # 10 Y:2013 10 2013 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $396 $1,880 Implemented
WM0022 # 02 Y:2013 02 2013 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,779 $6,480 Implemented
WM0022 # 03 Y:2013 03 2013 INSULATE BARE EQUIPMENT $2,744 $2,303 Implemented
MA0704 # 04 Y:2013 04 2013 REDUCE VENTILATION AIR $2,055 $5,900 Implemented
SD0460 # 01 Y:2013 01 2013 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $50,132 $152,300 Implemented
SD0460 # 03 Y:2013 03 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $11,357 $1,000 Implemented
SD0460 # 04 Y:2013 04 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,875 $900 Implemented
SD0460 # 07 Y:2013 07 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,515 $3,212 Implemented
SD0460 # 08 Y:2013 08 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,570 $200 Implemented
SD0460 # 10 Y:2013 10 2013 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $731 $2,500 Implemented
MI0233 # 01 Y:2012 01 2012 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $246,388 $33,021 Implemented