IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

90

matching recommendations
Reset
SIC 38 Instruments And Related Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0306 # 06 Y:2024 06 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $158 $432 n/a
IC0306 # 04 Y:2024 04 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $21,638 $33,160 n/a
IC0306 # 03 Y:2024 03 2024 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $2,629 $118 n/a
IC0306 # 07 Y:2024 07 2024 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,874 $10,418 n/a
IC0306 # 05 Y:2024 05 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,340 $0 n/a
IC0306 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $274,832 $1,429,458 n/a
IC0306 # 02 Y:2024 02 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $22,099 $10,776 n/a
IC0306 # 08 Y:2024 08 2024 INSULATE BARE EQUIPMENT $41,459 $20,803 n/a
IC0223 # 02 Y:2019 02 2019 INSTALL SPECTRAL REFLECTORS / DELAMP $267 $2,000 Not Implemented
IC0223 # 01 Y:2019 01 2019 INSTALL OCCUPANCY SENSORS $210 $24 Not Implemented
IC0222 # 03 Y:2019 03 2019 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $524 $0 Not Implemented
IC0222 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $757 $320 Not Implemented
IC0222 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,363 $2,231 Implemented
IC0223 # 03 Y:2019 03 2019 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $264 $0 Not Implemented
IC0223 # 04 Y:2019 04 2019 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $550 $0 Implemented
BD0302 # 05 Y:2006 05 2006 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $848 $260 Not Implemented
BD0302 # 06 Y:2006 06 2006 INSTALL OCCUPANCY SENSORS $835 $1,050 Not Implemented
BD0302 # 04 Y:2006 04 2006 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,130 $0 Implemented
BD0302 # 09 Y:2006 09 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $384 $0 Implemented
BD0302 # 10 Y:2006 10 2006 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $344 $500 Implemented
BD0302 # 11 Y:2006 11 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $304 $2,550 Not Implemented
BD0302 # 12 Y:2006 12 2006 MINIMIZE WATER USAGE $2,375 $1,725 Not Implemented
BD0302 # 03 Y:2006 03 2006 USE RADIANT HEATER FOR SPOT HEATING $1,699 $5,000 Not Implemented
BD0302 # 02 Y:2006 02 2006 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,381 $0 Implemented
BD0302 # 01 Y:2006 01 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,774 $0 Not Implemented