IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,140

matching recommendations
Reset
SIC 38 Instruments And Related Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0215 # 12 Y:2001 12 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,216 $0 Not Implemented
SF0215 # 13 Y:2001 13 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $461,186 $60,000 n/a
SF0215 # 14 Y:2001 14 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $139,058 $35,200 n/a
SF0215 # 15 Y:2001 15 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $5,003 $5,111 Implemented
LM0005 # 01 Y:2001 01 2001 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $635 $100 Implemented
LM0005 # 02 Y:2001 02 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $587 $115 Implemented
LM0005 # 03 Y:2001 03 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $25,900 $12,500 Not Implemented
LM0005 # 04 Y:2001 04 2001 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $3,600 $0 Not Implemented
LM0005 # 05 Y:2001 05 2001 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $168,480 $45,830 Not Implemented
LM0005 # 06 Y:2001 06 2001 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $6,000 $5,000 Not Implemented
MI0002 # 01 Y:2001 01 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $9,063 $414 Not Implemented
MI0002 # 02 Y:2001 02 2001 UPGRADE OBSOLETE EQUIPMENT $22,409 $6,500 Not Implemented
MI0002 # 03 Y:2001 03 2001 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $30,943 $20 Not Implemented
MI0002 # 04 Y:2001 04 2001 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $47,000 $300 Not Implemented
MI0002 # 05 Y:2001 05 2001 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,034 $3,531 Not Implemented
MI0002 # 06 Y:2001 06 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,800 $35 Not Implemented
MI0002 # 07 Y:2001 07 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,119 $690 Not Implemented
MI0002 # 08 Y:2001 08 2001 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $3,409 $20 Not Implemented
MI0002 # 09 Y:2001 09 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $94,000 $33,124 Not Implemented
MS0177 # 01 Y:2001 01 2001 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $3,133 $630 Implemented
MS0177 # 02 Y:2001 02 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $196 $209 Implemented
MS0177 # 03 Y:2001 03 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,066 $3,354 Not Implemented
WI0390 # 01 Y:2001 01 2001 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $8,897 $0 Implemented
WI0390 # 02 Y:2001 02 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,828 $9,500 Not Implemented
WI0390 # 03 Y:2001 03 2001 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $2,958 $0 Not Implemented