IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,140

matching recommendations
Reset
SIC 38 Instruments And Related Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0242 # 08 Y:1999 08 1999 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $300 $120 Not Implemented
AS0242 # 09 Y:1999 09 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $480 $60 Not Implemented
AS0242 # 10 Y:1999 10 1999 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $56,000 $36,200 Implemented
GT0652 # 01 Y:1998 01 1998 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $9,935 $0 n/a
GT0652 # 02 Y:1998 02 1998 METER WASTE WATER $6,890 $1,000 n/a
GT0652 # 03 Y:1998 03 1998 INSTALL STEAM TRAP $2,103 $2,800 n/a
GT0652 # 04 Y:1998 04 1998 UTILIZE OUTSIDE CONTRACTING $4,345 $0 n/a
GT0652 # 05 Y:1998 05 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $10,000 $250 n/a
GT0652 # 06 Y:1998 06 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,300 $0 n/a
GT0652 # 07 Y:1998 07 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $37,430 $130,994 n/a
IA0210 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,138 $17,423 Implemented
IA0210 # 02 Y:1998 02 1998 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $4,040 $12,186 Not Implemented
IA0210 # 03 Y:1998 03 1998 INSTALL OCCUPANCY SENSORS $2,457 $2,793 Implemented
IA0210 # 04 Y:1998 04 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,766 $4,820 Implemented
IA0210 # 05 Y:1998 05 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $134 $282 Implemented
IA0210 # 06 Y:1998 06 1998 MOVE PRODUCT USING MECHANICAL MEANS $261,385 $19,800 Not Implemented
IA0210 # 07 Y:1998 07 1998 USE RADIANT HEATER FOR SPOT HEATING $2,824 $10,101 Not Implemented
NC0151 # 01 Y:1998 01 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,157 $600 Not Implemented
NC0151 # 02 Y:1998 02 1998 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $33,411 $132,700 Not Implemented
NC0151 # 03 Y:1998 03 1998 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $401 $1,500 Not Implemented
NC0151 # 04 Y:1998 04 1998 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $700 $2,100 Not Implemented
NC0151 # 05 Y:1998 05 1998 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,290 $3,000 Not Implemented
NC0151 # 06 Y:1998 06 1998 UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID $3,822 $15,000 Not Implemented
NC0151 # 07 Y:1998 07 1998 USE ADSORPTION, ION EXCHANGE TO REMOVE CONTAMINANTS $11,500 $45,000 Not Implemented
NC0151 # 08 Y:1998 08 1998 USE EVAPORATION TO CONCENTRATE MATERIAL $4,721 $16,000 Not Implemented