Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,140
matching recommendationsSIC | 38 | Instruments And Related Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DS0070 # 05 Y:1996 | 05 | 1996 | INSTALL TIMERS AND/OR THERMOSTATS | $1,684 | $2,310 | Implemented |
UD0497 # 01 Y:1996 | 01 | 1996 | OPTIMIZE PLANT POWER FACTOR | $1,514 | $1,500 | Not Implemented |
UD0497 # 02 Y:1996 | 02 | 1996 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $1,460 | $300 | Not Implemented |
UD0497 # 03 Y:1996 | 03 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,035 | $20,230 | Implemented |
UD0497 # 04 Y:1996 | 04 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,760 | $13,724 | Implemented |
DS0058 # 01 Y:1996 | 01 | 1996 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $859 | $859 | Implemented |
DS0058 # 02 Y:1996 | 02 | 1996 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $638 | $175 | Implemented |
DS0058 # 03 Y:1996 | 03 | 1996 | INSTALL OCCUPANCY SENSORS | $164 | $100 | Not Implemented |
DS0058 # 04 Y:1996 | 04 | 1996 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,728 | $300 | Implemented |
DS0058 # 05 Y:1996 | 05 | 1996 | TREAT AND REUSE RINSE WATERS | $733 | $380 | Not Implemented |
DS0058 # 06 Y:1996 | 06 | 1996 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,885 | $1,050 | Implemented |
SD0154 # 01 Y:1996 | 01 | 1996 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,178 | $1,360 | Implemented |
SD0154 # 02 Y:1996 | 02 | 1996 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,982 | $400 | Implemented |
SD0154 # 03 Y:1996 | 03 | 1996 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $7,082 | $8,500 | Implemented |
SD0154 # 04 Y:1996 | 04 | 1996 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,750 | $40 | Implemented |
SD0154 # 05 Y:1996 | 05 | 1996 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,032 | $1,127 | Implemented |
SD0154 # 06 Y:1996 | 06 | 1996 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,485 | $1,127 | Implemented |
SD0154 # 07 Y:1996 | 07 | 1996 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $1,053 | $1,127 | Implemented |
SD0154 # 08 Y:1996 | 08 | 1996 | REPROCESS SPENT OILS ON SITE FOR RE-USE | $9,000 | $6,000 | Implemented |
SD0154 # 09 Y:1996 | 09 | 1996 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $3,250 | $4,000 | Implemented |
TN0588 # 01 Y:1996 | 01 | 1996 | DISTILL CONTAMINATED SOLVENTS FOR REUSE | $45,192 | $51,320 | Implemented |
TN0588 # 02 Y:1996 | 02 | 1996 | INSTALL DESICCANT HUMIDITY CONTROL SYSTEM | $14,500 | $13,000 | Not Implemented |
TN0588 # 03 Y:1996 | 03 | 1996 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,760 | $5,300 | Implemented |
TN0588 # 04 Y:1996 | 04 | 1996 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $610 | $1,800 | Not Implemented |
TN0588 # 05 Y:1996 | 05 | 1996 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $545 | $0 | Not Implemented |