IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,140

matching recommendations
Reset
SIC 38 Instruments And Related Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0290 # 04 Y:1993 04 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,146 $3,034 Implemented
MA0290 # 05 Y:1993 05 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,025 $110 Implemented
AM0192 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,950 $12,850 Implemented
AM0192 # 02 Y:1993 02 1993 OPTIMIZE PLANT POWER FACTOR $3,640 $5,500 Not Implemented
AM0192 # 03 Y:1993 03 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $210 $240 Implemented
KU0420 # 01 Y:1993 01 1993 RECOVER WASTE HEAT FROM EQUIPMENT $5,244 $12,675 Not Implemented
KU0420 # 02 Y:1993 02 1993 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,461 $2,079 Not Implemented
KU0420 # 03 Y:1993 03 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $830 $630 Implemented
KU0420 # 04 Y:1993 04 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $226 $113 Not Implemented
KU0420 # 05 Y:1993 05 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $126 $30 Not Implemented
KU0420 # 06 Y:1993 06 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $427 $0 Not Implemented
KU0420 # 07 Y:1993 07 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $403 $512 Not Implemented
ND0175 # 01 Y:1993 01 1993 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $62,950 $259,500 n/a
ND0175 # 02 Y:1993 02 1993 OPTIMIZE PLANT POWER FACTOR $6,581 $14,600 n/a
ND0175 # 03 Y:1993 03 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,783 $22,950 n/a
ND0175 # 04 Y:1993 04 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,617 $910 n/a
ND0175 # 05 Y:1993 05 1993 INSTALL OCCUPANCY SENSORS $1,587 $600 n/a
ND0175 # 06 Y:1993 06 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,507 $500 n/a
ND0175 # 07 Y:1993 07 1993 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,437 $1,140 n/a
ND0175 # 08 Y:1993 08 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,052 $0 n/a
ND0175 # 09 Y:1993 09 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $680 $300 n/a
ND0175 # 10 Y:1993 10 1993 TURN OFF EQUIPMENT WHEN NOT IN USE $677 $0 n/a
ND0175 # 11 Y:1993 11 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $137 $150 n/a
WV0015 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,512 $1,967 Implemented
WV0015 # 02 Y:1993 02 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,304 $46,430 Implemented