Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Arkansas |
---|---|
Assessment Year | 1994 |
Principal Product | Die Cast Watch Cases |
NAICS | n/a |
SIC | 3873 - Watches, Clocks, Watchcases & Parts |
Sales | $10,000,000-$50,000,000 |
# of Employees | 350 |
Plant Area (Sq.Ft.) | 273,000 |
Annual Production | 12,000,000 Pieces |
Production Hrs. Annual | 7,509 |
Location (State) | AR |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $665,756 | 10,332,943 | kWh | $0.06 |
Natural Gas | $230,653 | 86,998 | MMBtu | $2.65 |
TOTAL ENERGY COSTS | $896,409 | |||
RECOMMENDED SAVINGS* | $55,088 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $13,664 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Personnel Changes | Electricity Usage | Natural Gas | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY |
Savings: $864 Cost: $224 |
$864 | 13,482 | - | - | - | - |
$864 13,482 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $5,061 Cost: $940 |
$5,061 | 78,546 | - | - | - | - |
$5,061 78,546 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,747 Cost: $862 |
$3,747 | 58,030 | - | - | - | - |
$3,747 58,030 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $1,417 Cost: $1,000 |
- | - | $1,417 | 535 | - | - |
- - kWh |
$1,417 535 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $2,575 Cost: $700 |
$2,575 | 39,859 | - | - | - | - |
$2,575 39,859 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7245 USE DIRECT AIR SUPPLY TO EXHAUST HOODS |
Savings: $18,986 Cost: $100 |
$18,986 | 288,687 | - | - | - | - |
$18,986 288,687 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4134 REPLACE ELECTRIC MOTOR WITH FOSSIL FUEL ENGINE |
Savings: $22,438 Cost: $30,500 |
$37,300 | 579,132 | $(-8,071) | (-3,046) | $(-6,791) | - |
$37,300 579,132 kWh |
$(-8,071) (-3,046) MMBtu |
$(-6,791) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $55,088 Cost: $34,326 |
$68,533 | 1,057,736 | $(-6,654) | (-2,511) | $(-6,791) | - | $68,533 1,057,736 kWh |
$(-6,654) (-2,511) MMBtu |
$(-6,791) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $13,664 Cost: $3,726 |
$12,247 | 189,917 | $1,417 | 535 | - | - | $12,247 189,917 kWh |
$1,417 535 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Personnel Changes | Electricity Usage | Natural Gas | Personnel Changes |