IAC logo
IAC Assessment: AR0026
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AR0026
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Arkansas
Assessment Year 1994
Principal Product Die Cast Watch Cases
NAICS n/a
SIC 3873 - Watches, Clocks, Watchcases & Parts
Sales $10,000,000-$50,000,000
# of Employees 350
Plant Area (Sq.Ft.) 273,000
Annual Production 12,000,000 Pieces
Production Hrs. Annual 7,509
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $665,756 10,332,943 kWh $0.06
Natural Gas $230,653 86,998 MMBtu $2.65
TOTAL ENERGY COSTS $896,409
RECOMMENDED SAVINGS* $55,088 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $13,664
#|Description Savings
Cost
Status Electricity Usage Natural Gas Personnel Changes Electricity Usage Natural Gas Personnel Changes
$ kWh $ MMBtu $ $
01: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY Savings:
$864
Cost:
$224
$864 13,482 - - - - $864
13,482
kWh
-
-
MMBtu
-
-
$
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$5,061
Cost:
$940
$5,061 78,546 - - - - $5,061
78,546
kWh
-
-
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,747
Cost:
$862
$3,747 58,030 - - - - $3,747
58,030
kWh
-
-
MMBtu
-
-
$
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,417
Cost:
$1,000
- - $1,417 535 - - -
-
kWh
$1,417
535
MMBtu
-
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,575
Cost:
$700
$2,575 39,859 - - - - $2,575
39,859
kWh
-
-
MMBtu
-
-
$
06: 2.7245 USE DIRECT AIR SUPPLY TO EXHAUST HOODS Savings:
$18,986
Cost:
$100
$18,986 288,687 - - - - $18,986
288,687
kWh
-
-
MMBtu
-
-
$
07: 2.4134 REPLACE ELECTRIC MOTOR WITH FOSSIL FUEL ENGINE Savings:
$22,438
Cost:
$30,500
$37,300 579,132 $(-8,071) (-3,046) $(-6,791) - $37,300
579,132
kWh
$(-8,071)
(-3,046)
MMBtu
$(-6,791)
-
$
TOTAL RECOMMENDED Savings:
$55,088
Cost:
$34,326
$68,533 1,057,736 $(-6,654) (-2,511) $(-6,791) - $68,533
1,057,736
kWh
$(-6,654)
(-2,511)
MMBtu
$(-6,791)
-
$
TOTAL IMPLEMENTED Savings:
$13,664
Cost:
$3,726
$12,247 189,917 $1,417 535 - - $12,247
189,917
kWh
$1,417
535
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Personnel Changes Electricity Usage Natural Gas Personnel Changes