IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

127

matching recommendations
Reset
SIC 38 Instruments And Related Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0379 # 05 Y:2020 05 2020 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,953 $5,914 Not Implemented
MI0379 # 06 Y:2020 06 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,317 $2,100 Not Implemented
MI0379 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,846 $1,980 Not Implemented
MI0379 # 03 Y:2020 03 2020 USE SOLAR HEAT TO HEAT WATER $9,075 $12,000 Not Implemented
MI0379 # 02 Y:2020 02 2020 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $11,551 $2,080 Not Implemented
MI0379 # 01 Y:2020 01 2020 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $192,230 $217,000 Implemented
MI0368 # 01 Y:2020 01 2020 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $31,298 $16,924 Implemented
MI0368 # 02 Y:2020 02 2020 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $13,791 $2,940 Not Implemented
MI0368 # 03 Y:2020 03 2020 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $8,339 $39,554 Implemented
MI0368 # 04 Y:2020 04 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,279 $10,827 Implemented
MI0368 # 05 Y:2020 05 2020 INSTALL OCCUPANCY SENSORS $3,930 $1,355 Implemented
MI0368 # 06 Y:2020 06 2020 OPTIMIZE PLANT POWER FACTOR $2,326 $1,672 Implemented
MI0368 # 07 Y:2020 07 2020 UPGRADE CONTROLS ON COMPRESSORS $1,717 $3,320 Implemented
MI0368 # 08 Y:2020 08 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $663 $1,980 Implemented
MI0368 # 09 Y:2020 09 2020 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $626 $1,661 Implemented
MI0352 # 04 Y:2019 04 2019 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,201 $7,920 Implemented
MI0352 # 11 Y:2019 11 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $525 $160 Not Implemented
MI0352 # 05 Y:2019 05 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,725 $2,284 Implemented
MI0352 # 06 Y:2019 06 2019 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $3,012 $100 Implemented
MI0352 # 07 Y:2019 07 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,851 $1,846 Implemented
MI0352 # 08 Y:2019 08 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,571 $1,995 Not Implemented
MI0352 # 09 Y:2019 09 2019 INSTALL OCCUPANCY SENSORS $656 $319 Implemented
MI0352 # 12 Y:2019 12 2019 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $518 $2,294 Implemented
MI0352 # 03 Y:2019 03 2019 USE SOLAR HEAT TO HEAT WATER $7,116 $10,125 Implemented
MI0352 # 02 Y:2019 02 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $11,207 $3,600 Implemented