Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,140
matching recommendationsSIC | 38 | Instruments And Related Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0499 # 05 Y:2020 | 05 | 2020 | ELIMINATE/REDUCE AN OPERATION | $6,889 | $11,879 | Implemented |
SU0499 # 06 Y:2020 | 06 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,223 | $75,235 | Implemented |
SU0499 # 07 Y:2020 | 07 | 2020 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $345 | $64 | Implemented |
WV0591 # 01 Y:2020 | 01 | 2020 | ADJUST BURNERS FOR EFFICIENT OPERATION | $10,092 | $27,700 | Implemented |
WV0591 # 02 Y:2020 | 02 | 2020 | UPGRADE CONTROLS ON COMPRESSORS | $6,029 | $6,375 | Implemented |
WV0591 # 03 Y:2020 | 03 | 2020 | INSTALL OCCUPANCY SENSORS | $4,927 | $4,625 | Implemented |
WV0591 # 04 Y:2020 | 04 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,574 | $1,468 | Implemented |
WV0591 # 05 Y:2020 | 05 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,647 | $958 | Implemented |
WV0591 # 06 Y:2020 | 06 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,896 | $1,770 | Not Implemented |
WV0591 # 07 Y:2020 | 07 | 2020 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $1,752 | $4,700 | Implemented |
WV0591 # 08 Y:2020 | 08 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $834 | $50 | Not Implemented |
WV0591 # 09 Y:2020 | 09 | 2020 | DEVELOP A REPAIR/REPLACE POLICY | $944 | $338 | Implemented |
WV0591 # 10 Y:2020 | 10 | 2020 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $507 | $2,500 | Not Implemented |
WV0591 # 11 Y:2020 | 11 | 2020 | INSULATE BARE EQUIPMENT | $151 | $373 | Implemented |
WV0591 # 12 Y:2020 | 12 | 2020 | INSULATE BARE EQUIPMENT | $98 | $360 | Not Implemented |
DL0181 # 01 Y:2020 | 01 | 2020 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $32,510 | $0 | Implemented |
DL0181 # 02 Y:2020 | 02 | 2020 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $2,480 | $1,500 | Implemented |
DL0181 # 03 Y:2020 | 03 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,540 | $10,000 | Not Implemented |
DL0181 # 04 Y:2020 | 04 | 2020 | UPGRADE CONTROLS ON COMPRESSORS | $4,970 | $6,500 | Not Implemented |
DL0181 # 05 Y:2020 | 05 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $47,490 | $87,516 | Implemented |
DL0181 # 06 Y:2020 | 06 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,150 | $3,146 | Implemented |
DL0181 # 07 Y:2020 | 07 | 2020 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,480 | $10,375 | Implemented |
MA0812 # 01 Y:2020 | 01 | 2020 | USE SOLAR HEAT TO MAKE ELECTRICTY | $228,815 | $892,794 | Not Implemented |
MA0812 # 02 Y:2020 | 02 | 2020 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $56,847 | $3,250 | Not Implemented |
MA0812 # 03 Y:2020 | 03 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $35,615 | $32,940 | Implemented |