IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,140

matching recommendations
Reset
SIC 38 Instruments And Related Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0078 # 09 Y:2015 09 2015 USE PHOTOCELL CONTROLS $2,082 $2,816 Not Implemented
WM0078 # 10 Y:2015 10 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,824 $1,300 Not Implemented
WM0078 # 11 Y:2015 11 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,156 $300 Not Implemented
WM0078 # 12 Y:2015 12 2015 INSTALL OCCUPANCY SENSORS $1,006 $1,500 Not Implemented
OR0651 # 01 Y:2015 01 2015 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $58,422 $9,638 Implemented
OR0651 # 02 Y:2015 02 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $270,822 $210,050 Implemented
OR0651 # 03 Y:2015 03 2015 RECOVER AND REUSE WASTE MATERIAL $93,635 $132,280 Not Implemented
CO0710 # 01 Y:2015 01 2015 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,950 $3,660 Not Implemented
CO0710 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,710 $340 Implemented
CO0710 # 03 Y:2015 03 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $470 $60 Implemented
CO0710 # 04 Y:2015 04 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $370 $1,170 Not Implemented
MI0282 # 01 Y:2015 01 2015 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $23,744 $1,120 Not Implemented
MI0282 # 02 Y:2015 02 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $11,822 $10,322 Implemented
MI0282 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,613 $1,660 Implemented
MI0282 # 04 Y:2015 04 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,005 $1,220 Not Implemented
MI0282 # 05 Y:2015 05 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,694 $40 Not Implemented
MI0282 # 06 Y:2015 06 2015 REDUCE HEAT GAIN BY WINDOW TINTING $3,779 $16,060 Not Implemented
MI0282 # 07 Y:2015 07 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,378 $40 Implemented
MI0282 # 08 Y:2015 08 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,655 $1,080 Implemented
MI0282 # 09 Y:2015 09 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,303 $5,120 Implemented
MI0282 # 10 Y:2015 10 2015 INSTALL OCCUPANCY SENSORS $1,250 $995 Implemented
MI0282 # 11 Y:2015 11 2015 USE PHOTOCELL CONTROLS $197 $600 Implemented
MI0282 # 12 Y:2015 12 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $50 $85 Not Implemented
OR0650 # 01 Y:2015 01 2015 ELIMINATE/REDUCE AN OPERATION $20,348 $2,295 Not Implemented
OR0650 # 02 Y:2015 02 2015 IMPROVE COMBUSTION CONTROL CAPABILITY $23,922 $24,660 Not Implemented