IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

173

matching recommendations
Reset
SIC 38 Instruments And Related Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0796 # 05 Y:2009 05 2009 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,866 $2,500 Not Implemented
UD0796 # 06 Y:2009 06 2009 RECOVER WASTE HEAT FROM EQUIPMENT $1,734 $500 Implemented
UD0796 # 07 Y:2009 07 2009 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $1,104 $10,500 Not Implemented
UD0796 # 08 Y:2009 08 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $935 $2,115 Implemented
UD0796 # 09 Y:2009 09 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $788 $0 Implemented
UD0796 # 10 Y:2009 10 2009 INSTALL AUTOMATIC STACK DAMPER $418 $400 Implemented
UD0796 # 11 Y:2009 11 2009 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $364 $250 Not Implemented
UD0796 # 12 Y:2009 12 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $284 $0 Implemented
UD0796 # 13 Y:2009 13 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $149 $0 Implemented
WV0316 # 01 Y:2005 01 2005 REPAIR OR REPLACE STEAM TRAPS $10,848 $1,000 Implemented
WV0316 # 02 Y:2005 02 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $9,434 $0 Implemented
WV0316 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,222 $0 Not Implemented
WV0316 # 04 Y:2005 04 2005 UTILIZE A LESS EXPENSIVE COOLING METHOD $4,152 $2,375 Not Implemented
WV0316 # 05 Y:2005 05 2005 RECOVER WASTE HEAT FROM EQUIPMENT $3,816 $580 Not Implemented
WV0316 # 06 Y:2005 06 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,317 $1,705 Not Implemented
WV0316 # 07 Y:2005 07 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,199 $1,000 Implemented
WV0316 # 08 Y:2005 08 2005 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,722 $0 Implemented
WV0316 # 09 Y:2005 09 2005 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $2,491 $60 Implemented
WV0316 # 10 Y:2005 10 2005 INSULATE BARE EQUIPMENT $825 $141 Implemented
WV0316 # 11 Y:2005 11 2005 INSULATE BARE EQUIPMENT $783 $70 Implemented
WV0316 # 12 Y:2005 12 2005 DEVELOP A REPAIR/REPLACE POLICY $552 $345 Implemented
UD0713 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $84,867 $94,373 Not Implemented
UD0713 # 02 Y:2005 02 2005 USE OPTIMUM TEMPERATURE $64,754 $2,500 Not Implemented
UD0713 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,435 $41,783 Implemented
UD0713 # 04 Y:2005 04 2005 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $15,628 $3,900 Not Implemented