IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

155

matching recommendations
Reset
SIC 38 Instruments And Related Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0316 # 10 Y:2005 10 2005 INSULATE BARE EQUIPMENT $825 $141 Implemented
WV0316 # 11 Y:2005 11 2005 INSULATE BARE EQUIPMENT $783 $70 Implemented
WV0316 # 12 Y:2005 12 2005 DEVELOP A REPAIR/REPLACE POLICY $552 $345 Implemented
UD0713 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $84,867 $94,373 Not Implemented
UD0713 # 02 Y:2005 02 2005 USE OPTIMUM TEMPERATURE $64,754 $2,500 Not Implemented
UD0713 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,435 $41,783 Implemented
UD0713 # 04 Y:2005 04 2005 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $15,628 $3,900 Not Implemented
UD0713 # 05 Y:2005 05 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $9,868 $22,600 Not Implemented
UD0713 # 06 Y:2005 06 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,925 $200 Implemented
UD0713 # 07 Y:2005 07 2005 DEVELOP A REPAIR/REPLACE POLICY $1,021 $3,807 Implemented
UD0644 # 01 Y:2002 01 2002 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $462,150 $500 Not Implemented
UD0644 # 02 Y:2002 02 2002 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $18,360 $0 Implemented
UD0644 # 03 Y:2002 03 2002 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $12,612 $0 Not Implemented
UD0644 # 04 Y:2002 04 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,397 $13,222 Not Implemented
UD0644 # 05 Y:2002 05 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,764 $2,775 Not Implemented
UD0644 # 06 Y:2002 06 2002 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $2,953 $131 Implemented
UD0644 # 07 Y:2002 07 2002 AIR CONDITION ONLY SPACE NECESSARY $1,285 $0 Implemented
UD0644 # 08 Y:2002 08 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $478 $500 Not Implemented
UD0644 # 09 Y:2002 09 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $475 $1,348 Implemented
UD0568 # 01 Y:1999 01 1999 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $8,393 $3,600 Not Implemented
UD0568 # 02 Y:1999 02 1999 REUSE / RECYCLE/ SELL PAPER PRODUCTS $5,475 $7,000 Not Implemented
UD0568 # 03 Y:1999 03 1999 CHANGE ZONE REHEAT COILS TO VARIABLE AIR VOLUME BOXES $5,171 $4,000 Implemented
UD0568 # 04 Y:1999 04 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,154 $2,000 Not Implemented
UD0497 # 01 Y:1996 01 1996 OPTIMIZE PLANT POWER FACTOR $1,514 $1,500 Not Implemented
UD0497 # 02 Y:1996 02 1996 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,460 $300 Not Implemented