Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,018
matching recommendationsSIC | 38 | Instruments And Related Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UC2314 # 10 Y:2023 | 10 | 2023 | REPLACE BOILER | $8,265 | $39,281 | n/a |
UC2314 # 09 Y:2023 | 09 | 2023 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $14,221 | $0 | n/a |
UC2314 # 08 Y:2023 | 08 | 2023 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,033 | $0 | n/a |
UC2314 # 07 Y:2023 | 07 | 2023 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,082 | $1,674 | n/a |
UC2314 # 06 Y:2023 | 06 | 2023 | INSTALL / REPAIR INSULATION ON STEAM LINES | $627 | $1,061 | n/a |
UC2314 # 05 Y:2023 | 05 | 2023 | INSULATE BARE EQUIPMENT | $2,702 | $800 | n/a |
UC2314 # 04 Y:2023 | 04 | 2023 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $5,943 | $21,500 | n/a |
UC2314 # 03 Y:2023 | 03 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,655 | $1,283 | n/a |
UC2314 # 02 Y:2023 | 02 | 2023 | PAY UTILITY BILLS ON TIME | $3,211 | $0 | n/a |
UC2314 # 01 Y:2023 | 01 | 2023 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $5,543 | $0 | n/a |
SU0539 # 04 Y:2023 | 04 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,490 | $11,867 | n/a |
SU0539 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,866 | $1,925 | n/a |
SU0539 # 02 Y:2023 | 02 | 2023 | REDUCE VENTILATION AIR | $10,262 | $5,600 | n/a |
SU0539 # 01 Y:2023 | 01 | 2023 | DISCONNECT BALLASTS | $1,626 | $0 | n/a |
DL0229 # 01 Y:2023 | 01 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $61,397 | $0 | n/a |
DL0229 # 02 Y:2023 | 02 | 2023 | REDUCE VENTILATION AIR | $32,353 | $0 | n/a |
DL0229 # 03 Y:2023 | 03 | 2023 | USE OPTIMUM TEMPERATURE | $8,303 | $0 | n/a |
DL0229 # 04 Y:2023 | 04 | 2023 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $44,923 | $1,275 | n/a |
DL0229 # 05 Y:2023 | 05 | 2023 | USE HEAT PUMP FOR SPACE CONDITIONING | $2,948 | $14,000 | n/a |
DL0229 # 06 Y:2023 | 06 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $104,868 | $500,000 | n/a |
SU0533 # 01 Y:2023 | 01 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $393 | $0 | n/a |
SU0533 # 02 Y:2023 | 02 | 2023 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $8,173 | $0 | n/a |
SU0533 # 03 Y:2023 | 03 | 2023 | PAY BILLS ON TIME TO AVOID LATE FEES | $1,766 | $0 | n/a |
SU0533 # 04 Y:2023 | 04 | 2023 | DISCONNECT BALLASTS | $8,707 | $0 | n/a |
SU0533 # 05 Y:2023 | 05 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $79 | $6 | n/a |